  • Large-scale works to address urgent water and sanitation needs - Kurdistan, Iraq - Case Study

    Project type Water & wastewater Area served Urban; semi-urban; agricultural Population served 2,700,000 Status Ongoing This project will help address urgent water supply needs driven by the ever expanding population of the Kurdistan region of Iraq. Providing increased drinking water ...


    By Biwater

  • Beijing - Gao Bei Dian Water Reclamation Plant - Case Study

    Client: Beijing Drainage Group Solution: CambiTHP - B12 On 1st September 2014, Cambi was awarded the initial Beijing project, Gao Bei Dian, from Beijing Drainage Construction Company, a flagship for large-scale sludge projects with Cambi Thermal Hydrolysis Process (Cambi THP). The ...


    By Cambi Group AS

  • Beijing - Xiao Hong Men Water Reclamation Plant - Case Study

    Xiao Hong Men Water Reclamation Plant On 10th of December 2014, Cambi was awarded the Xiao Hong Men contract, the second contract signed with our client, Beijing Drainage Construction Company. The project was finished in February 2017, making Xiao Hong Men the first operating Cambi plant in China, serving a population of two million people. Cambi Thermal Hydrolysis Process (Cambi ...


    By Cambi Group AS

  • Manchester - Davyhulme - Case Study

    Client: United Utilities Solution: CambiTHP - B12 Davyhulme One of UK's largest wastewater treatment works (WwTW) is set to become a valuable source of renewable energy. The benefits of a major upgrade at Davyhulme WwTW in Manchester include the generation of up to 10 megawatts of electricity, 24 hours per day, from biogas ...


    By Cambi Group AS

  • Waterschap De Dommel - Tilburg - Case Study

    Client: Waterschap De Dommel Solution: CambiTHP - B12 Tilburg Waterboard De Dommel (WDD) is responsible for water management and wastewater collection and treatment in the South-Eastern part of the Netherlands, covering approx. 151.000 ha and collecting wastewater from approx. 900.000 inhabitants. WDD operates in total 8 ...


    By Cambi Group AS

  • Athens - Psyttalia - Case Study

    Client: EYDAP Solution: CambiTHP - B6 Psyttalia The wastewater treatment plant of Psyttalia, is the final recipient of domestic sewage and pre-treated industrial wastewater of the greater Athens area in Greece, receiving an average wastewater flow of 730.000 m³/d, with a biological treatment capacity of 3,500,000 ...


    By Cambi Group AS

  • Hias IKS - Hamar - Case Study

    Client: Hias IKS Solution: CambiTHP HIAS, Hamar The HIAS wastewater treatment plant serves the city of Hamar and several smaller villages in the area around. It is dimensioned for a population equivalent of 90,000. In 1995 Cambi built its first full-scale thermal hydrolysis installation at HIAS as part of a new sludge ...


    By Cambi Group AS

  • Scottish Water - Edinburgh - Seafield - Case Study

    Client: Scottish Water Solution: CambiTHP - B6 Seafield On 2 October 2013, MWH Treatment awarded Cambi a contract for the installation of two lines of Cambi’s modular THP B6 system, at Stirling Water’s Seafield Waste Water Treatment Works, Edinburgh, Scotland. Each line is capable of treating 50 dry tonnes of ...


    By Cambi Group AS

  • AmperVerband - Geiselbullach - Case Study

    Client: Amperverband Solution: Cambi SolidStream Amperverband At AmperVerband WWTP, Cambi has installed its first SolidStream plant. The SolidStream plant now works a full scale demonstration plant, treating all digested sludge from the waste water treatment plant. AmperVerband WWTP treat sludge from its 150 000 inhabitants, in addition to ...


    By Cambi Group AS

  • Lindum - Drammen - Case Study

    Client: Lindum Solution: CambiTHP - B6 Drammen /Lindum The plant in Drammen is designed to treat approx. 6,000 tons of sludge from municipalities in the Drammen region, together with some grease and septic. The biogas produced at the plant, will have an energy content of 16 GW per annum. The energy could be used for either ...


    By Cambi Group AS

  • Dublin - Ringsend - Case Study

    Client: Celtic Anglian Water Solution: CambiTHP - B12 Ringsend The WWTP at Ringsend Dublin was originally operating a two train drum drying systems for drying the raw primary sludge to meet the requirements of pasteurisation in Ireland. The plant was extended by the addition of SBR biological treatment reactors to the existing primary ...


    By Cambi Group AS

  • PUB - Singapore - Jurong - Case Study

    Client: PUB Solution: CambiTHP - B6 Jurong The Jurong WRP, owned and operated by PUB (Public Utility Board, Singapore) is located in the Jurong district, in the west part of Singapore. The plant is treating sludge from the waste water plant. As part of the Phase 4 Expansion project PUB choose to ...


    By Cambi Group AS

  • Between the Lakes - An innovative onsite system serves a condominium and housing project on a popular chain of lakes in a Wisconsin resort community - Case Study

    System Profile Location: Three Lakes, Wis. Facility served: Condominium and housing project (total 267 bedrooms) Designer: Baudhuin Inc., Sturgeon Bay, Wis. Installer: Bergeman Plumbing & Heating, Chippewa Falls, Wis. Site conditions: Level; stratified ...


    By BioMicrobics, Inc.

  • What is Dissolved air flotation or DAF?

    Dissolved air flotation (DAF) is one of the most versatile and effective process in water, wastewater treatment and desalination Dissolved air flotation (DAF) is one of the most important and effective process in the treatment of all types of water -industrial and urban wastewater treatment, water ...


    By Toro Equipment S.L.

  • Naz Textile AS - Case Study

    Project Name Naz Orme Tekstil A.§. Wastewater Treatment Plant Employer Naz Orme Kumas ve Tekstil San. A.§. Contractor Enta Muhendislik Antma Taah. San. Ve Tic. Ltd. §ti. Location of the plant Corlu Tekirdag/ TURKEY Scope of work Industrial and ...

  • Ozakteks Textile - Case Study

    Project Name Ozakteks Tekstil A.§. Wastewater Treatment Plant Employer Ozakteks Tekstil A.§. Contractor Enta Muhendislik Aritma Taah. San. Ve Tic. Ltd. Sti. Location of the plant ISTANBUL/TURKEY Scope of work Industrial and Domestic Wastewater ...

  • Silivri Municipality - Case Study

    Project Name Silivri Municipality Wastewater Treatment Plant Employer Silivri Municipality Contractor Enta Muhendislik Antma Taah.    San. Ve Tic. Ltd. Sti.         Location of the plant Istanbul/TURKEY Scope of work ...

  • Usak Karma OSB - Case Study

    Project name Usak Mixed Organized Industrial Zone Wastewater Treatment Plant Employer Usak Mixed Organized Industrial Zone Head of Entrepreneur Association Contractor Enta Muhendislik Antma Taah. San. Ve Tic. Ltd. Sti. Location of the plant Usak/TURKEY Scope of ...

  • Ortaklar Organize – Case Study

    Project Name Ortaklar Organize Sanayi Bdlgesi Wastewater Treatment Plant Employer Ortaklar Organize Sanayi Bdlgesi Contractor Enta Muhendislik Aritma Taah. San Tic. Ltd. §ti. Location of the plant AYDIN/TURKEY Scope of work Industrial Wastewater Treatment ...

  • Ulker-Ak Food Aydin Factory – Case Study

    Project Name Ulker- Ak Gida Aydin Wastewater Treatment Plant Employer Ulker-AkGida Contractor Enta Miihendislik Aritma Taah. San. Ve Tic. Ltd. Sti. Location of the plant Aydin/TURKEY Scope of work Industrial Wastewater Treatment Plant Contract ...