spillway gate Articles
-
Rocky reach spillway apron underwater concrete repair - Case Study
We were contracted to preform an underwater concrete repair to the spillway baffle under spill gate 3, and preform an inspection of the spill way and dentate from spillway 2-8 and 9-12. The spillway was separated into two sections by a fish ladder between Bays 8 and 9. The perimeter of the eroded areas were delineated using an U/W track creating a key way, ensuring a minimum depth of repair, ...
-
Controlling the water level of a river dam case study
SmartScan25 provides an efficient solution for controlling water level of the Wardha river reservoir from a distance of 40m (131ft) thus preventing draughts and floods to the district of Amravati, India. Upper Wardha Dam is build up on the Wardha River at a height of 36m (118ft) and 7km (4.35mi) length and situated on the boundary of Amravati and Wardha Districts, India. Controlling the water ...
-
Beneficial effects on water management of simple hydraulic structures in wetland systems: the Vallevecchia case study, Italy
Conflicting water uses in coastal zones demand integrated approaches to achieve sustainable water resources management, protecting water quality while allowing those human activities which rely upon aquatic ecosystem services to thrive. This case study shows that the creation and simple management of hydraulic structures within constructed wetlands can markedly reduce the non-point pollution from ...
-
El Guapo Dam (Venezuela, 1999) - Case Study
Construction of El Guapo Dam began in 1975 and was completed in 1980. The dam is 197 feet tall and stores 114,000 acre-feet of drinking and irrigation water for the Barlovento Region in the state of Miranda, Venezuela. Because bedrock is deep (approximately 65 feet below the original ground surface), the embankment was built on a sandy gravel soil foundation. An elastoplastic cutoff wall extends ...