weir Articles
-
Bucharest WWTP Project Romania - Case Study
Customer : Aktor & Athena JV (Greece) Project Name : Bucharest WWTP Capacity : 1.450.000 m³/ d Manufacturing year : 2009 Scope of supply 8 pcs. of Ø 55mt PST Scraper Bridges; Dry Parts = CS+ Sand B. + Epoxy coated, Wet Parts = AISI 304 with its accessories such as SS weirs & baffles and GRP difuser drum. 3 pcs. of Longitudinal Grit & Grease Scrapers; Dry Parts ...
By ASTIM A.S.
-
Online discharge measurement with OTT SLD
Background For the economic management of the waterways between Elbe and Oder it is essential to know the discharge of these rivers at defined locks. The authority for water and navigation (WSA) in Lauenburg operates hydrological stations for the measurement of water level and discharge to effectively regulate the water flow at the locks in Plau and Malliß (Mueritz-Elde-waterway) and in ...
-
Ataköy WWTP Project Turkiye - Case Study
Customer: WTE (Germany) Project Name: Ataköy WWTP Capacity: 400.000 m³/ d Manufacturing year: 2008 Scope of supply 4 pcs. of Coarse Screens with ~ 19 m. Length and 1.500 mm. Width, Completely AISI 316L. (Cable Operated Type) 9 pcs. of Fine Screens; Completely AISI 316L. (Cable Operated Type) 4 pcs. of Belt Conveyors 2 pcs. of Screw Conveyor & Compactors; Through: ...
By ASTIM A.S.
-
River weir upgrade illustrates Rotork’s extended scope capabilities - Case Study
Sector : Water & Waste Water Category : Electric Actuators, Services Products : IQ - Standard, Extended Scope Overview Rotork is well known for supplying flow control equipment for new and upgraded industrial plants and processes on a global scale. In these contracts, often involving tens or hundreds of valve actuators and associated control equipment, Rotork works with valvemakers, ...
By Rotork plc
-
Lake Fort Smith dam & reservoir enlargement
Client: City of Lake Fort Smith, Ark. Completion Date: 2006 Services Provided Intake tower with microtunnels Road relocation Raw water lines Outlet works Pressure reducing station Dam embankment Principal spillway Auxiliary spillway Project Summary Burns & McDonnell, together with Shannon & Wilson as principal geotechnical consultant, completed the final design phases for ...
-
Automatic Flow Control Valves Solve Raw Water Management Challenges
For all the historical and natural charm of Greenville, S.C., efforts to serve the city's water customers were hampered by raw water management challenges at a nearby reservoir. A new automatic flow control valve provided Greenville Water, City of Greenville Commission of Public Works, with a customized solution. Greenville is situated about halfway between Charlotte, N.C., and Atlanta, up ...
By Cla-Val
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you