wastewater flow monitoring Articles
-
Quarry dewatering compliance - Case Study
Louis W. Bray Construction installed a Greyline Area-Velocity Flow Meter in 2009 to meet Ministry of Environment regulations. Their permit stipulated effluent limits plus monitoring, sampling and flow measurement of wastewater discharged from the site to the South Raisin river. The Ontario Water Resources Act requires flow monitoring for any quarry dewatering greater than 50,000 liters per day. ...
-
Quarry Dewatering Compliance - Case Study
Louis W. Bray Construction installed a Greyline Area-Velocity Flow Meter in 2009 to meet Ministry of Environment regulations. Their permit stipulated effluent limits plus monitoring, sampling and flow measurement of wastewater discharged from the site to the South Raisin river. The Ontario Water Resources Act requires flow monitoring for any quarry dewatering greater than 50,000 liters per day. ...
-
A pilot study of a subsurface-flow constructed wetland treating membrane concentrate produced from reclaimed water
A pilot study was conducted for 7 months for the City of Oxnard, California, on the use of constructed wetlands to treat concentrate produced by microfiltration and reverse osmosis (RO) of reclaimed wastewater. The treatment performance of a transportable subsurface-flow wetland was investigated by monitoring various forms of nitrogen, orthophosphate, oxygen demand, organic carbon, and ...
-
KPDES Permit Compliance: Metals in Wastewater Effluent at Fort Knox
ABSTRACT Prior to constructing a new FOTW, Fort Knox had a history of exceeding KPDES effluent limitations for ammonia and BOD. The new 6 MGD FOTW solved the problem, but metals exceedances became an issue. The exceedances could be linked to several factors: low water-quality based effluent limitations (WQBELs) on the new KPDES permit, high background concentrations of some metals, and high ...
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you