flocculation Articles
-
MBR Based treatment of tractor manufacturing wastewater
Abstract Kubota corporation has recently built new tractor manufacturing plant in Jefferson Georgia. CWT and Kubota agreed to design, pilot test and build a system for full water reuse of up to 75% of produced wastewater. Wastewater is very complex and contains complexed heavy metals, fine suspended solids, emulsified oils, grease, strong degreasing agents, nutrients (nitrogen and phosphorous) ...
-
NSW Tannery benefits from highly efficient chrome removal process and a very dry sludge - Case study
NCMC (Northern Cooperative Meat Company) engaged Hydroflux Industrial to design and install a new treatment plant to remove Chrome from wastewater originating from the on site tannery in Casino, NSW. Located on the same site as the abattoir all hides are received immediately after slaughter and put directly into the chrome tanning process. The raw wastewater from the factory contains up to 300 ...
-
Devolping Pre-treatment Strategy for SWRO Systems
Typically open-sea water intake structures are constructed in the shallow areas where sea water depth is in the range of 3m up to 10m. Due to this SWRO plant with open intake will have source water with high debris, suspended solids and aquatic organisms requiring a very elaborate pretreatment system. Thus Pretreatment design becomes an important part for a long term operation of the seawater ...
-
Kastamonu Entegre – Case Study
Project Name Kastamonu Entegre Agac Sanayi Tic. A.S- Wastewater Treatment Plant Employer Kastamonu Entegre Agac Sanayi Tic. A.S. Contractor Enta Muhendislik Antma Taah. San. Ve Tic. Ltd. Sti. Location of the plant TATARSTAN Scope of work Industrial Wastewater Treatment Plant Contract Date 2013 Completion Date 2014 Flowrate of the plant:1.200 m3/day Inlet Pollution Parameters: COD: ...
-
Ergene I Organized Industrial Area – Case Study
Project Name Ergene 1 Organized Industrial Zone Wastewater Treatment Plant Employer Ergene 1 Organized Industrial Zone Contractor Enta Miihendislik Antma Taah. San. Ve Tic. Ltd. Sti. Location of the plant Tekirdag/TURKEY Scope of work Design of Industrial Wastewater Treatment Plant Contract Date 2012 Completion Date 2013 Flowrate of the plant: 60.00CI m3/ day Inlet Pollution Parameters: ...
-
Velimese I Organized Industrial Zone – Case Study
Project Name Velimese Organized Industrial Zone Wastewater Treatment Plant Employer Velimese Organized Industrial Zone Contractor Enta Muhendislik Antma Taah. San. Ve Tic. Ltd. Sti. Location of the plant Teklrdag / TURKEY Scope of work Design of Industrial Wastewater Treatment Plant Contract Date 2012 Completion Date 2013 Flowrate of the plant: 200.000 m V day Inlet Pollution Parameters: ...
-
Turkgucu Organized Industrial Zone – Case Study
Project Name Turkgucu Organized Industrial Zone Wastewater Treatment Plant Employer Turkgucii Organized Industrial Zone Contractor Enta Muhendislik Aritma Taah. San. Ve Tic. Ltd. Sti. Location of the plant Tekirdag/TURKEY Scope of work Design of Industrial Wastewater Treatment Plant Contract Date 2012 Completion Date 2013 Flowrate of the plant: 30.0 00 m3/ day Inlet Pollution Parameters: ...
-
Muratli Organized Industrial Zone – Case Study
Project Name Murath Organized Industrial Zone Wastewater Treatment Plant Employer Murath Organized Industrial Zone Contractor Enta Muhendislik Aritma Taah. San. Ve Tic. Ltd. Sti- Location of the plant Tekirdag/TURKEY Scope of work Design of Industrial Wastewater Treatment Plant Contract Date 2012 Completion Date 2013 Flowrate of the plant: 37.500 m3/ day Inlet Pollution Parameters: COD: ...
-
Ergene II Organized Industrial Zone – Case Study
Project Name Ergene II Organized Industrial Zone Wastewater Treatment Plant Employer Ergene II Organized Industrial Zone Contractor Enta Muhendislik Antma Taah. San. Ve Tic. Ltd. Sti. Location of the plant Tekirdag/ TURKEY Scope of work Design of Industrial Wastewater Treatment Plant Contract Date 2012 Completion Date 2013 Flowrate of the plant: 200.000 m V day Inlet Pollution Parameters: ...
-
Case study - Hadleys
Material Source: Excavation waste from construction sites. Equipment Installed: Main components included: Commander 1400 Hopper Feed Conveyor 16 x 5 Rinsing Screen Logwasher c/ with Dewatering Screens Finesmaster 120 Sand Plant 16 x 5 Dry Screen Bivitec Pre- Screen System 9m dynamic Thickener Clarified Water Tank Flocculent Mixing and Dosing Tank Multiple conveyors. Project ...
-
Flocculation - Flotation pretreatment improves operation of MBR installed to treat snack food manufacturing wastewater
Abstract Large food manufacturing company has facilities to produce their well known brand name dairy based products in rural Indiana. As is commonly case with dairy wastewater, significant amount of proteins, sugars, oil and some suspended solids are present. Company installed membrane bioreactor (MBR) System to treat such wastewater for possible reuse. The MBR performed poorly due to membrane ...
-
Case study - Nottinghamshire Recycling
DUO Equipment delivered and installed a new full washing and water management plant for Nottinghamshire Recycling Ltd (NRL). Based in Worksop, Nottinghamshire, NRL is a sustainable waste solution provider processing C & D waste, green waste, wood and recycled aggregates. The new washing and water management plant (which includes a Gennaretti centrifuge system) will provide NRL with the ...
-
Frozen Food Applications - Case Study
Introduction Clean Water Technology Inc. (CWT), the creator of the Gas Energy Mixing (GEM) System, offers the most advanced primary treatment system on the market. The GEM System provides superior reduction of total suspended solids (TSS), biological and chemical oxygen demand (BOD/COD), fats, oils and grease (FOG) and turbidity and at the same time provides complete expandability in terms of ...
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you