Treatment of pumping wells case study
Results from an Australian Trial Problem The pumping wells had accumulated fat and grease on their walls. With time septic conditions had set in giving rise to strong malodours and the local residents had started to complain about the smell. In addition acids produced under septic conditions were damaging the structural integrity of the pipes and pumps and increasing maintenance costs. Action ...
-
Mixing an 8X8 Foot Lift Station Wet Well - Case Study
The GridBee AP500 defeats grease problem in less than a month. Topics: portable, no moving parts, 316L stainless steel construction, AU-200 System Overview: This Municipality has several lift stations of differing dimensions which experience fat, oil and grease (FOG) build up. They were looking for a solution that was easily portable for use in different lift station wet wells across their ...
-
Dewatering Crews Keep the Alameda Corridor Dry and Open for Business
Griffin installed a multitude of deep wells along the alignment of the proposed railway to allow for construction. The discharge from the wells was pumped via large diameter high density polyethylene pipe (HDPE) to a below grade mixing vault, where a neutralizing agent was introduced to the groundwater as the quality of the groundwater was not allowed to discharge to the designated receiving ...
-
Energy-efficient Cooling System for Musikkens Hus (House of Music)
DESMI has delivered and installed highly efficient pumps, pipes and wells for intake of water from the fiord for the cooling system of Musikkens Hus. Musikkens Hus is known as the musical gathering point of Northern Denmark and covers more than 20,000 m2 distributed on nine storeys and among other facilities it hosts four concert halls, five stages, a restaurant, and educational and ...
By DESMI A/S
-
Taos, New Mexico SORB 33® Arsenic Removal Case Study
Site BackgroundThe Town of Taos, located in northern New Mexico and with a population of 8,000 was awarded an arsenic removal treatment system as part of the US EPA’s Arsenic Removal Demonstration Program in January, 2005. The town had a new well, storage tank and booster pump system that was scheduled to be connected to the Town’s distribution system and placed into service only after the ...
-
Semi-analytical 3D solution for assessing radial collector well pumping impacts on groundwater–surface water interaction
We present a new semi-analytical flow and transport model for the simulation of 3D steady-state flow and particle movement between groundwater, a surface water body and a radial collector well in geometrically complex unconfined aquifers. This precise and grid-free Series Solution-analytic element method approach handles the irregular configurations of radial wells more efficiently than ...
-
Brown City Michigan SORB 33 Arsenic Removal
Site Background The City of Brown City, Michigan located about 60 miles north of Detroit, was awarded the first of the US Environmental Protection Agency’s (EPA) treatment systems as part of the EPA Arsenic Removal Demonstration Program in June 2003. The EPA and its team of consultants on the Demonstration Program panel selected Severn Trent Services’ SORB 33® arsenic adsorption system for use ...
-
Webb Consolidated Independent School - Bruni, Texas Arsenic Treatment System
Webb Consolidated Independent School District (Webb CISD) located in Bruni, Texas applied to the U.S. Environmental Protection Agency (USEPA) to participate in the arsenic treatment demonstration program for Round 2 and was selected. The school has a water-supply well which pumps water to a 12,000 gallon storage tank. Waterquality analyses revealed that arsenic concentrations exceeded the new ...
-
Water Active: Borehole Management in Civil Engineering Projects
Groundwater wells are common to many civil engineering schemes and their operational performance can play a crucial role in the successful delivery of a project, whether used for construction dewatering, alternative water supplies for facilities or any other application , the well performance must be optimized and high levels of operational efficiency and service availability achieved. A ...
-
Bank filtration as managed surface-groundwater interaction
Riverbank Filtration (RBF) is a managed surface-groundwater interaction process where surface water is induced to flow to pumping wells installed on the banks of rivers and lakes. We present the surface-groundwater interaction issues at various geomorphologic settings, from the headwaters of a river to its confluence with the oceans/lakes. In each reach, the factors for the sustainable operation ...
-
Case study 103: Oil well and salt water disposal site
Operational Profile Type of Operation: OilWell,Salt Water InjectionWell Location: Texas Equipment: 10x20water knockout, 6x20 heated vertical separator b/d: 3800 bbl Gravity of oil: 41 degrees BS&W beforestudy: 0.04% Unit size: 3” Separation Enhancer Key Findings: 11% production increase Line pressure reduction 600psi to 400psi Investment payback period 7 months Eliminated oil ...
-
Cleo Springs, Oklahoma - in-situ chemical oxidation case study
A gasoline spill occurred when a fuel tanker was forced off this curve in rural Oklahoma. Initial responders were unsuccessful in their effort to remove all of the contaminated soil. Cedar Creek Engineering was contracted to remediate the residual soil and groundwater contamination. Here a recovery well and reagent injection points are installed. The treatment process called for Fenton's reagent ...
-
Project - Augmentation and Strengthening of Adityapur Urban Water Supply Scheme under Adityapur Municipal Corporation, Jharkhand
Construction of Intake Well of 60 MLD capacity with Jack Well. Construction of Intake Well cum Pump House of 30 MLD Contruction of WTP of 60 MLD and 30 MLD capacity with E&M works and SCADA Construction of 11 nos OHSRs of various capacity (1.0 ML to 2.5 ML) Supply, Laying, Testing and Commissioning of 493 KM DI Pipe Fixing of 50,000 House Service Connections including water meter. Serving ...
-
DTI installs 3 blind horizontal remediation wells in cobble
The Issue An active retail gas station next to a wetland area has benzene and trimethylbenzene plumes in a water table aquifer containing sand, gravel and cobbles. Rock fragments and boulders several feet in diameter lie in the vadose zone, between the ground surface and the water table. Business at the gas station would slow down or stop for an extended period of time if a vertical air sparge ...
-
SCADA monitoring maximizes pump system performance - Case Study
The system tracks pump efficiency so repairs can be anticipated with timely, accurate and reliable information. Manually managing a water system can be difficult, especially with population growth and limited resources. Saving time and money are common challenges for utilities. Water system management was an ongoing concern for the city of Eureka, Mo., located approximately 28 miles southwest of ...
-
City of Wellman, Texas - Arsenic Treatment System
The City of Wellman, Texas (Wellman) applied to the U.S. Environmental Protection Agency (USEPA) to participate in the arsenic treatment demonstration program for Round 2 and was selected. Wellman has five water-supply wells which pump water to a 110,000 gallon storage tank. Water-quality analyses revealed that arsenic concentrations exceeded the new maximum contaminant level (MCL). AdEdge ...
-
Numerical Evaluation of Effectiveness of Drainwells in Dewatering Overburden at Surface Coal Mines
Abstract: Typical sedimentary sequences overlying coal seams consist of interbedded sandstones, siltstones, shales, and rider coal seams. In many surface coal mine settings, these sediments are saturated; and prior dewatering of them is necessary for effective and economic mining, including the stacking of saturated spoils. Such sedimentary sections usually have a very low vertical hydraulic ...
-
Effective Groundwater Monitoring Using Dedicated Pumping Tubes
This article describes a groundwater monitoring procedure that does not require decontamination of pumping equipment, eliminates the chance of cross contamination between wells, and uses a surface pump. Two surface pumps are described, one for water level depths less than 25 feet and one for water level depths greater than 25 feet. Install Dedicated Pumping Tubes A dedicated pumping tube ...
-
Project Completion - Maple Leaf Foods - Jet Mixing Pumps and Nozzles
Waste’n WaterTech is pleased to announce the completion of two (2) Vaughan jet mixing systems at the Maple Leaf Foods wastewater pretreatment facility located in Winnipeg, MB. One system will keep the contents of an EQ tank blended and ready for transfer. The second system will handle the DAF scum and sludge both as a recirculation system as well as performing pump out duties when ...
By Flottweg SE
-
High Efficiency Softening Process (HESP) for Frack Flowback - produced water treatment study for City of Grand Prairie, TX
Barnett Shale play in Texas, the natural gas economy According to Potter, the 5,500 wells currently pumping gas in the Barnett Shale play will ultimately generate on the order of $35 billion for their owners. As those companies pay taxes and wages, and as their employees and contractors in turn spend their money, there is an economic ripple effect, creating an overall value of about $100 ...
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you