Ellis Environmental Management, Inc.

Case Study: Redondo Beach Power Plant

SHARE
Sep. 10, 2008
Ellis administered the removal of damaged lead based paint and asbestos pipe insulation in this idled power plant prior to filming efforts by numerous local studios.
Most popular related searches