C.F. Maier was commissioned to roof a screw pumping station at the Cologne-Stammheim sewage treatment plant. The order comprised four chambers, each 3.80 meters wide and around 10 meters long.
Most popular related searches
The particular challenge was that the chambers run upwards at an angle from around half their length, so the covers had to make a "kink" to follow this gradient. The rectangular panels were anchored to GRP brackets that were mounted on the edges of the basins, allowing a total area of 167 square meters to be covered.