ENTA Treatment Systems Engineering Contracting LTD

Kahramanmaras Wastewater Treatment Plant – Case Study

0

Project Name
Kahramanmaras Wastewater Treatment Plant

Employer
Kahramanmaras Municipality

Contractor
Enta Muhendislik Antma Taah. San. Ve Tic. Ltd. Sti.

Location of the plant
Kahramanmaras / TURKEY s

Scope of work
Design of Domestic Wastewater Treatment Plant

Contract Date
2015

Completion Date
2016

Flowrate of the plant: 111.000 m3/ day

Inlet Pollution Parameters:

COD: 70.304 kg/day
BOD: 35.152 kg/day
SS: 34.195 kg/day
Total Nitrogen: 5.337 kg/day
Total Phosphorus: 1.073 kg/day

Outlet Discharge Values:

BOD: 317 mg/L
COD: 633 mg/L
SS: 308 mg/L
Total Nitrogen: 48 mg/L
Total Phosphorus: 10 mg/L

Units of the Plants:

Physical Treatment

  • Screen
  • Grit & Grease Removal
  • Equalization Basin

Advanced Treatment

  • Anaerobic Basin
  • Nitrification - Denitrification
  • Nitrogen - Phosphorus Removal
  • Anoxic- Aerobic Basin

Sludge Dewatering

  • Sludge Thickening Basin
  • Sludge Drying
  • Anaerobic Digester

Odor Removal Unit

Customer comments

No comments were found for Kahramanmaras Wastewater Treatment Plant – Case Study. Be the first to comment!