ENTA Treatment Systems Engineering Contracting Corporation

Ortaklar Organize – Case Study

SHARE
Nov. 3, 2018

Project Name
Ortaklar Organize Sanayi Bdlgesi Wastewater Treatment Plant

Employer
Ortaklar Organize Sanayi Bdlgesi

Contractor
Enta Muhendislik Aritma Taah. San Tic. Ltd. §ti.

Location of the plant
AYDIN/TURKEY

Scope of work
Industrial Wastewater Treatment Plant

Contract Date
2012

Completion Date
2013

Flowrate of the plant: 2.000 m3/ day

Inlet Pollution Parameters:
COD: 1.500 mg/L
SS: 500 mg/ L
PH: <10
Oil & Grease: 50 mg/ L
Temperature: < 40 "C

Outlet Discharge Values
COD: 300 mg/L
SS: 100 mg/ L
PH: 6-9
Oil & Grease: 10 mg/ L

Units of the Plant:

Physical Treatment

  • Mechanical Screen

Biological Treatment

  • Aeration Basin with Blower and Diffuser
  • Sedimentation Basin

Sludge Dewatering

  • Sludge Thickening Tank
  • Filter Press