Peine Sewage Treatment Plant - Case Study
Feb. 1, 2021
Courtesy ofC.F. Maier GmbH & Co KG
In February 2021, C.F. Maier was commissioned by Kögel Bau GmbH & Co. KG to supply a GRP cover for a large combined tank at the Peine sewage treatment plant. The basin, with a diameter of 40 meters, is divided into a primary clarifier and an aeration basin and covers a total area of 1,200 square meters.
Most popular related searches
sewage treatment plant
sewage treatment
sewage plant
primary clarifier
sewage
aeration basin
basin cover
clarifier primary
clarifier aeration
basin aeration
Two different types of cover were used for the implementation in order to meet the specific requirements of the inner and outer areas of the basin. The Ha5 type with barrel-shaped and flat elements was used in the inner area, while the Af+Aa type with trapezoidal barrel shells and flat elements arranged in between was used in the outer ring. The project was realized in a three-color concept.