Capacity: 500MW
A major power generator in Malaysia owns and operates two turbines operating in Malaysia. The turbines, GT1A and GT2A, are gas fired and both have an operating capacity of 250MW. Two SmartCEM 60 Analyzers were installed to determine the effectiveness of PEMS as an alternative to CEMS for gas turbines.
A study was conducted to determine which parameters would be suitable for inputs and outputs. After two rounds of testing a short list of 100 parameters were used for the model. The PEMS was certified to monitor SO2, NOx, O2, CO, and CO2. Model training data was collected and the PEMS was considered a viable alternative to PEMS in 2012.