Astim A.S.
  1. Companies
  2. Astim A.S.
  3. Articles
  4. Siemens Project - Case Study

Siemens Project - Case Study

SHARE
May. 15, 2018
Courtesy ofAstim A.S.
  • Customer: Christ Holland B.V. (Netherlands)
  • Project Name: SIEMENS Project
  • Manufacturing year: 2007 / 2008

Scope of supply

  • 4 pcs. Ø 2.000 x 2.700 mm. Mixed Bed Exchanger Tanks supplied complete with supporting legs, manholes, sight glasses, nozzles etc. Maximum Working Pressure of 10 bars; Material: CS with 3 mm. Rubber Coating Inside
  • 1 pcs. Ø 1.600 x 4.500 mm. Separation/Cation Reg. Filter Tank supplied complete with supporting legs, manholes, sight glasses, nozzles etc. Maximum Working Pressure of 6 bars; Material: CS with 3 mm. Rubber Coating Inside
  • 1 pcs. Ø 1.400 x 4.500 mm. Mixing/Anion Reg. Filter Tank supplied complete with supporting legs, manholes, sight glasses, nozzles etc. Maximum Working Pressure of 6 bars; Material: CS with 3 mm. Rubber Coating Inside
  • 2 pcs. Ø 1.400 x 2.500 mm. Gravel Filter Tank supplied complete with supporting legs, manholes, sight glasses, nozzles etc. Maximum Working Pressure of 6 bars; Material: CS
  • 2 pcs. Ø 1.400 x 2.700 mm. Active Carbon Filter Tank supplied complete with
  • supporting legs, manholes, sight glasses, nozzles etc. Maximum Working Pressure of 6 bars; Material: CS
  • 4 pcs. Ø 800 x 3.000 mm. Mixed Bed Exchanger Tanks supplied complete with
  • supporting legs, manholes, sight glasses, nozzles etc. Maximum Working Pressure of 6 bars; Material: CS with 3 mm. Rubber Coating Inside
  • Manufacturing of Necessary CS Platforms and carrying out necessary Piping Works