ENTA Treatment Systems Engineering Contracting Corporation
- Home
- Companies
- ENTA Treatment Systems Engineering ...
- Articles
- Ulker-Ak Food Aydin Factory – Case ...
Ulker-Ak Food Aydin Factory – Case Study
Nov. 3, 2018
Project Name
Ulker- Ak Gida Aydin Wastewater Treatment Plant
Employer
Ulker-AkGida
Contractor
Enta Miihendislik Aritma Taah. San. Ve Tic. Ltd. Sti.
Location of the plant
Aydin/TURKEY
Scope of work
Industrial Wastewater Treatment Plant
Contract Date
2012
Completion Date
2013
Flowrate of the plant: 1.500 m3/day
Inlet Pollution Parameters:
COD: 2000-2500 mg/L
SS: 800-900 mg/L
PH: 9-ll
Oil & Grease: 300-400 mg/L
Temperature: 10-30°C
Outlet Discharge Values
COD: SS: 6-9
Oil & Grease: 30-50 mg/ L
Units of the Plant:
Physical Treatment
- Screen
- DAF Unit with Chemicals
Biological Treatment
- Aeration Basin with Blower and Diffuser
- Sedimentation Basin
Sludge Dewatering
- Sludge Thickening Tank
- Decanter
Most popular related searches
