WBA Plessa Wastewater Treatment Plant - Case Study
Sep. 1, 2022
Courtesy ofC.F. Maier GmbH & Co KG
In September 2022, C.F. Maier completed a major project at the WBA Plessa water treatment plant in Brandenburg. The order comprised three sludge thickeners, each with an internal diameter of 18 meters and an external diameter of 19.10 meters. The central concrete bridges in each basin have a width of 2.12 meters.
Most popular related searches
water treatment plant
wastewater treatment plant
mobile crane
sludge thickener
sludge thickening
water treatment
wastewater treatment
wastewater plant
thickener sludge
thickener
The Ha5 cover system was used for this project, which consists of eight large, barrel-shaped shells per basin as the main supporting elements, supplemented by flat elements in between. To ensure thermal insulation, the entire cover was constructed with sandwich elements and internal PU foam.
The individual cover components were lifted to a height of around 6 meters and installed using a mobile crane.