C.F. Maier GmbH & Co KG
  1. Companies
  2. C.F. Maier GmbH & Co KG
  3. Articles
  4. Weilheim Sewage Treatment Plant - Case ...

Weilheim Sewage Treatment Plant - Case Study

SHARE
Feb. 1, 2022

In February 2022, C.F. Maier was commissioned by Stadtwerke Weilheim to supply and install the covers for two almost identical circular thickener tanks. The basins have an internal diameter of 6.63 meters and 7.00 meters.

Most popular related searches

In order to meet the requirements, the covers had to be raised by 700 mm. This was achieved with the help of specially manufactured, vertically curved flat elements on which the actual covers were installed. Type D2 was used, which consists of two barrel shells and flat elements in between. The total area covered is 121 square meters. The project was completed in October 2022.