American Integrated Service came to Environmental Noise Control when the City of Carson, CA, contracted them for a landmark soil-remediation project. Their work entailed placing pipelines underground at approximately 36" " -46" to channel the extracted soil materials out of the contaminated soil. Significant excavation and improvement to existing properties are also part of the plan, which encompasses at least 27 phases of work. Throughout the excavation, pipeline drilling, and soil remediati
The Suicide Squad press junket was to be held in the loading dock of New York City’s historical Moynihan Station.
The space, though beautiful, is full of reflective, flat surfaces, which would make successful, simultaneous audiovisual interviews near to impossible. It was of the utmost importance that worldwide media outlets could obtain high-quality interviews with the stars, so Environmental Noise Control was called in to consult and design sound mitigation for the event.
The Tennessee Valley Authority contracted ENC after a sinkhole, water seepage, and “internal erosion” conditions were discovered at the Boone Dam in East Tennessee.
The TVA was concerned with the sound and light pollution throughout the rehabilitation of the Boone Dam, as operations and pumping units were required to work twenty-four hours per day.
ENC designed and engineered a nearly 1,000-foot-long wall to withstand 120-mile-per-hour wind-loads for the dam.