Cameron a Schlumberger Company services
Drilling - Rigs and Equipment Managed Pressure Drilling Services
Cameron - MPD Project Management and Consulting Services
When pressure-related challenges are expected on a drilling campaign, M-I SWACO MPD engineers can provide analysis, planning, and execution support—independent of the equipment being used on your project—to optimize drilling performance and thereby lower well construction costs.
Cameron - Mobile MPD Services
For high-volume or pad drilling scenarios, the @balance Xpress mobile MPD services` trailer- or skid-mounted systems rapidly integrate MPD components into the drilling operation. The streamlined approach reduces rig-in and rig-out time at the wellsite, enabling fast, efficient, and cost-effective operations on a callout basis. Operators using skidding rigs to complete pad drilling projects can leverage the speed and flexibility of the trailer to deploy MPD capabilities on each well. Additionally, the mud-gas separator is mounted on hydraulic pistons and does not require a crane to be rigged up.
