Centek Laboratories, LLC services
LEED Indoor Air Quality Testing
LEED - 4 IAQ Air Testing Program
To Establish Better Quality Indoor Air In the Building After Construction and During Occupancy. The New V4 requirements are as follows: Air testing now worth (2 points). After construction ends and before occupancy, but under ventilation conditions typical for occupancy, conduct baseline IAQ testing using protocols consistent with the methods listed in Table 1 for all occupied spaces. Use current versions of ASTM standard methods, EPA compendium methods, or ISO methods, as indicated. Laboratories that conduct the tests for chemical analysis of formaldehyde and volatile organic compounds must be accredited under ISO/IEC 17025 for the test methods they use. Retail projects may conduct the testing within 14 days of occupancy.
LEED - 3.2 IAQ Air Testing Program
Per LEED® 2009 for New Construction and Major Renovations IEQ Credit 3.2: Construction Indoor Air Quality Plan—Before Occupancy OPTION 2. Air Testing.
Cost-Effective Sustainable Air Sampling Program
SAVINGS are made possible through our ALL IN ONE PRICING schedule. TIME IS MONEY, because of its simplicity, you will spend less time in the field. Our standard analytical turn around time is 5 business days. We offer rush turn around times as soon as same day. The faster the building owner can occupy, the more money they can make.
