Denilco Environmental Technology (Suzhou) Co., Ltd.
5 products found

Denilco Environmental Technology (Suzhou) Co., Ltd. products

Denilco - Denilco Movable Flood Control Panel

The Denilco flood control panel is designed to block liquids and protect the city from the torrential floods. The device is a movable flap. It is a temporary flood control panel that can stand alone and support the floodgate. The effect of friction caused by the ground makes it more stable, suitable for use on a relatively flat ground, such as urban asphalt pavement, or concrete floor. As long as the flood control panel is prepared in advance and the wind control is done, it can be used at any time. Keep your property safe. (The effective water blocking height of the product is: 52cm for the relevant units to order 75cm 120cm height)

Denilco - Inflatable Flood Wall

The world`s most innovative flood protection equipment - Denilco inflatable flood wall, according to different models of D50, D75 and D100, can contain up to 50, 75, 100 cm of flood, respectively, become a temporary replacement flood control equipment for sandbags”。

Denilco - 75cm Flood Barrier

Denilco launched new model DZ75 flood barrier, which is 100cm width, 85cm depth, 75cm height.

Denilco - 60cm height flood boxwall

Denilco combined flood prevention board is designed to protect the city from sudden rainstorm and flood waterlogging.This device is a temporary flood control board which is freestanding and self-anchored by the water pressure on flood control board and press it to the ground to increase its friction with the ground to make it more stable. Our flood control boards are suitable for use on flat ground, such as urban asphalt, pavement or cement floor, as long as the flood control board is prepared in advance, do a good job of flood risk management, you can keep your property safety at any time.

Denilco - Water active flood bags DP436

Denilco self-inflating sandbags have a wide range of applications, can be used for the temporary flood control works, such as increasing the height of the dyke to stop the shortage, enclosing the water to prevent the overflow, engineering closure, the blockage of the ditch and the dark hole, reinforcement of flood control dams at any time, temporary flood prevention works such as urban water dam, street flood wall etc. It is only 275g before, after 2-3 minutes’ absorption can reach 20kgs, replace the usage of the soil to build a flood dam rapidly. To reduce the loss caused by the lack of soil in the emergency scene and the failure to take care in time.