Rush-Overland Manufacturing products
Wastewater Industry
Rush GEN II - Model RSU 000 - Steam Unit
Unit is Constructed on 6″ Channel Frame with 5″ Channel Crossmembers. 1/4″ SA36 Carbon Steel Floor Plate. Hose Storage Tubes Mounted in Frame to Store 40′ of Steam Hose.
Rush Overland - Model Superlift Gen II - CIPP Units
Our newest CIPP units provide the one thing that is most needed in this industry – Efficiency. Heater efficiency is the key to profitability and our new Gen II models offer the best available.
Nova - Model UV - Main Line Sealing System
The NOVA Lateral Sealing System provides an excellent alternative to traditional Cured-in-Place Pipe (CIPP) method by implementing UV LED technology to lateral sewer line sealing. The NOVA Lateral Sealing System operates inside 8” to 18” diameter main lines and is capable of performing lateral seal tasks on 4” and 6” laterals. The NOVA Lateral Sealing System is compatible with existing UV laminates designed to mold to the shape of the lateral opening in the main line, bridging from the inside of the main line to the internal circumference of the lateral sewer line and simultaneously sealing both surfaces with curing cycles of 8 minutes.
