- Home
- Companies
- Severfield plc
- Products
Severfield plc products
DAM - Tunnel Acoustic Cladding
The buildings were designed to cover the access holes for plant and equipment required for tunnelling as well as the removal of earth and installation of concrete tunnel linings. DAM’s contract also included the procurement of the acoustic cladding and acoustic doors which were secured through our established supply chain, this unique package has ensured the most cost effective design coordination between the critical parties with no integration issues and compliance with the employers’ requirements, which in turn ensured the noise reductions required for the local tenants.
DAM - Underground Station
DAM Structures were contracted to fabricate, install and connect new structural steelwork to existing structure at Victoria Station to facilitate the new southern ticket hall upgrade, providing the ground floor support structure & ticket hall entrance structure.
DAM - Temporary Façade Retention Power Station Towers
DAM Structures were contracted to supply and install nine temporary façade retention towers and two frames to allow work to start on the dismantling and rebuilding of the Grade II listed Annex A and Turbine Hall A to modern specifications.
DAM - Underwater Cable Protection System
Our contract comprised of the fabrication & installation of ship protection fenders and a ‘U’ Tube for underwater cables at the new Canary Wharf Station.
DAM - Wood Wharf Temporary Tie System
DAM Structures was contracted to provide detailed design, fabrication, supply and installation of a temporary tie system to restrain the existing ‘secant wall’ during the excavation of new foundations and basement works for the new multi-storey structure.
DAM - Embassy Gardens Steelwork Structural
DAM Structures were tasked with providing and installing a 500 tonne vierendeel truss bridge, which spans between the two new residential towers in Embassy Gardens, London at levels 8 to 12.
DAM - Custom House Station
Whilst the main station structures were formed out of concrete there was a requirement for steel structures and bridges, which was awarded to DAM Structures due to our expertise in steel fabrication.
DAM - Road Station
DAM structures were awarded the contract for the manufacturing, delivery and installation of the 1,100 tonnes of temporary propping.
Bulk Handling Systems
Severfield - Bin Activators System
This convenient and economical solution can be easily retrofitted to both silos and hoppers. Bin activators are commonly used to aid the discharge of products where vessel geometry is compromised. By using vibration and applying this directly into the bulk solid material, it aids the flow and discharge of granular and powdered products from silos and hoppers. Our bin activators are installed at a predetermined outlet diameter to suit material, vessel geometry and application. Consisting of a conical bottom and internal conical baffle, the bin activator is supported beneath the silo or hopper to enable effective discharge. The internal conical baffle plate is positioned above the opening of the activated section of the device, working to both support the material static load above the outlet and transmit vibration directly into the product.
Severfield Siloflo - Aeration Discharge System for Material Handling
Severfield provides a cost-effective material discharge system, with our Siloflo product. The Severfield Siloflo aeration discharge system offers a cost-effective and reliable method of discharging dry materials that fluidise with the injection of air. Siloflo can be fitted in any number of configurations to suit your application and is widely used in the cement and similar industries. Siloflo can provide a discharge solution with low operational and maintenance costs and as the aeration pads are externally mounted, they can easily be retrofitted to existing silos, hoppers and bins.
