Toshiba Water Solutions Private Limited services
Toshiba - Design Build Service
Design-build, which is the most prevalent form of project delivery for our projects, assigns complete responsibility for the design engineering, construction, installation, and commissioning to a single party. This form of project delivery has the advantage of lower cost and accelerated schedule, as design and construction activities can be scheduled to occur simultaneously – reducing construction time and site overheads.
Toshiba - Design Engineering Service
Design is the essential creative process of engineering – different from science –which calls for imagination, application of technical expertise and experience, and skillful use of materials. It is the reflection of the project making it look brilliant, good or bad. Good engineering design involves many parameters upon which the success of the project depends, each of which has its own subset of laws, standards, practices, codes and regulations. Proper Design Engineering saves time as well as money involved in the project.
Toshiba - Engineering and Procurement Services
This mode of project delivery is particularly adopted by clients who prefer self-execution of projects. Especially in units where already large amount of infrastructure installation taking place, would prefer just engineering and procurement part be served and would prefer to take up the Civil works part of the Treatment plant themselves. Though this is a common case with many upcoming mega projects there are many other conditions like in the case of international projects where a availing the necessary equipment for the civil works would be convenient for a local third party contractors etc;
Toshiba - Feasibility Studies Service
Feasibility studies includes ‘Economic Feasibility’ to carry out cost-benefit analysis, ‘Technical Feasibility’ to access potential risks and their solution, ‘Operational Feasibility’, ‘Schedule Feasibility’ to estimate timelines and optimize resources and time to accomplish project activities as per the schedule and also ‘Legal Feasibility’ to bind to the copyrights, financial reporting requirements, contractual obligations, ownership, outsourcing arrangements, etc. Feasibility study enables one to carry out Payback analysis, Net Present Value Analysis, Return on Investment Analysis before project activities commence. Moreover, since the feasibility study is often the first stage of a project’s life cycle, the potential for cost optimization at this stage is the highest.
Toshiba - In-House Operations and Maintenance (O&M) Services
We have in-house operations and maintenance (O&M) resources for operating water and wastewater treatment systems and can offer this as a part of a complete design-build-operate package. We can also take over the O&M responsibilities of treatment systems built by others for those clients who wish to outsource this work. We have the institutional knowledge to rapidly address commonly encountered operational issues.
