WOIMA Corporation
2 products found

WOIMA Corporation products

WOIMA Corporation - Waste Pre-Sorting Plant

The waste pre-sorting process starts with weighing the incoming garbage trucks before depositing their waste in the tipping storage. This acts as a buffer and enables deliveries 24/7 independent of the pre-sorting plant operating hours. It also ensures continuous waste flow during the pre-sorting operation.

WOIMA Corporation - Waste Collection And Reception Power Plant

The power plant operations begin with the waste reception. If the waste is source-separated, then each waste fraction can be stored in their own silos. General waste is dumped in a common waste reception bunker, or in some case on to a waste field. The right solution depends on local conditions. In dry areas, a large waste fields allows waste time to dry up, whereas in rainy regions there must be an enclosed, or at least roofed, waste reception and storage facility. Humidity has a major impact on the calorific value and combustibility of the waste.