ABO valve, s.r.o
- Home
- Companies & Suppliers
- ABO valve, s.r.o
- Downloads
- Ball Check Valves Installation manual
Ball Check Valves Installation manual
www.abovalve.com 1 Dalimilova 54b 783 35 Olomouc - Chomoutov Czech Republic Instructions for the installation Ball check valves 1. Position the ball valve between the flanges together with gaskets. 2. Tighten the flanges lightly with four bolts and align the position of the ball valve. 3. Attach the flanges at several points to the piping using a welding electrode. 4. Remove the ball valve. 5. Weld the flanges to the piping. 6. When the flanges have cooled down, insert the ball valve again with gaskets. The arrow on the body must coincide with the flow direction. www.abovalve.com 2 Dalimilova 54b 783 35 Olomouc - Chomoutov Czech Republic Krí These instructions as well as other information – also in other languages – are available at www.abovalve.com or upon request at: ABO valve, s.r.o. Dalimilova 54b 783 35 Olomouc - Chomoutov Czech Republic Tel. 00420 585 223 955 Fax 00420 585 223 984 abovalve@abovalve.com www.abovalve.com Last revision: 27 January 2011 7. Centre the ball valve and tighten it lightly using four bolts. Add the remaining bolts (tighten them in a “criss-cross pattern”).
Most popular related searches
