RLC Technologies, Inc.
  1. Companies & Suppliers
  2. RLC Technologies, Inc.
  3. Downloads
  4. Completed Projects and Case Studies ...

Completed Projects and Case Studies Brochure

COMPLETED PROJECTS AND CASE STUDIESIndirect Thermal Desorption10/11/2011 RLC Technologies, Inc. 1Major Projects (1 of 2)10/11/2011 RLC Technologies, Inc. 2Project NameGeneralContractorOwner / Address Contaminants YearOn-site Thermal Remediation of Soils - Allied-Signal, East Rutherford, NJSmith TechnologyNew JerseyAllied-SignalMorristown, NJPCB's, PAH's 1995On-site Thermal Remediation of Chlorinated Solvents - Carteret, NJERM Enviroclean Ewing, NJConfidentialCarteret, NJTCE/ChlorinatedHydrocarbons1996Remediation of Petroleum Contaminated Soil -Baytown TexasTetra Process ServicesThe Woodlands, TXExxonBaytown, TexasRefinery Waste 1997Remediation of Petroleum Contaminated Soil -Borger, TexasTetra Process ServicesThe Woodlands, TXPhillips 66Borger, TexasRefinery Waste 1997Remediation of Soil Contaminated with Drill CuttingsSR2Ooltewah, TNPEMXVillahermosa, MexicoDiesel FuelCrude Oil1998Remediation of Tanker bottom sludge -Singapore - Sold 3 UnitsSingaport CleanseasSingaporeSingaport CleanseasPte., Ltd. -SingaporeHigh ChainHydrocarbons97,98 2000Remediation of Petroleum Contaminated Soil -Andrews County, West TexasTetra Process ServicesThe Woodlands, TXTSD FacilityAndrews County, West TexasTSD facility waste 2000On-site Thermal Remediation Drill cuttings -Kristensund, NorwayTetra Process ServicesThe Woodlands, TXTPS NorwayKristensund, NorwayDrill Cuttings fromthe North Sea2000On-site Thermal Remediation Drill cuttings -Fujariah, United Arab EmiratesEcoref.Fujariah, United Arab EmiratesEcoref.Fujariah, United Arab EmiratesDrill cuttings 2001Remediation of Petroleum Contaminated Soil -St. Croix, Virgin IslandsTetra Process ServicesThe Woodlands, TXHess Refinery (Hovensa)St. Croix, Virgin IslandsRefinery Waste 2001On-site Thermal Remediation Drill cuttings -Abu Dhabi, UAE- 2 UnitsGulf EnvironmentalAbu DhabiGENCO-HabshanHabshan, U.A.E.Drill cuttings2002 2003Major Projects (2 of 2)10/11/2011 RLC Technologies, Inc. 3Project NameGeneralContractorOwner / Address Contaminants YearOn-site Thermal Remediation Drill cuttings -Saudi Arabia.SEWAl-Khobar, Saudi ArabiaSEWAl-Khobar, Saudi ArabiaDrill cuttingsCrude Oil2003On-site Hazardous Waste RecyclingEast Chicago INPollution Control IndustriesPollution Control IndustriesEast Chicago INIndustrial Solvents,Organic Wastes2004On-site Thermal Remediation Drill cuttings -Safat KuwaitWataniya Environmental ServicesWataniya Environmental Services. Safat KuwaitDrill cuttings, CrudeOil & Waste from '91 War2005On-site Thermal Remediation Puertollano SpainTradebeBarcelona SpainRepsolPuertollano SpainBio-Solids, Oliy Sludge, TPH Soil 2006Remediation of Petroleum Contaminated Soil -Bonny Facility NigeriaTitan Projects Nig. LtdPort Harcourt NigeriaShell OilNigeriaRefinery Waste 2006On-Site Remediation Drill CuttingsSan Paulo BrazilESBRASan Paulo BrazilPetrobrasBrazilDrill Cuttings 2007Central Environment Protection Facilty (BeAAT) -Ruwais UAESNC-LavalinMontreal CanadaADNOCTakreer UAEDrill cuttings &Refinery Waste2007Remediation of Petroleum Contaminated Soil -Bilbao SpainLezamaTrapagaran (Bizkaia) SpainRepsolBilbao SpainRefinery WasteBiological Waste2008On-site Thermal Remediation Drill cuttings -LouisanaPhillips Services CorporationHouston TXShell OilHouston TXRefinery Waste 2009ZOIL Hazardous Waste Recycling Facility -Madina-Accra , GhanaZoil Services LtdMadina-Accra, GhanaZOOMLIONMadina-Accra , GhanaOily Sludge, Contaminated Soils,Hazardous Materials2011TexCycle Hazardous Waste Recycling Facility -Kuala Lumpur, MalaysiaTexCycleTexCycleKuala Lumpur, MalaysiaOily Wastes, Hazardous Materials2011Case Study 110/11/2011 RLC Technologies, Inc. 41. Contract Title: ADCO Drilling Operations2. Client Contact Information: Client name and contact information available upon approved request .3. Contract Location Habshan, U.A.E.4. Contract Start Date 10/20025. Contract Finish Date 20056. Quantity Treated (m3) 30,000 tons7. Treatment Method Thermal Desorption8. Rate of Treatment (m3/hr) 3.5 to 4.5 tons per hour (dependent upon feed)9. Working Hours per Day 2410. Working Days per Week 5.511. Project Description:RLC Technologies contracted to manufacture equipment to be used for the ADCO drilling operations in Habshan, UAE. The equipment was used to process drill cuttings.Project requirements per contract exert:The typical composition of the Waste cuttings or Sludge, is as follows:Solids Content: ±70% Volume/VolumeOil Content: ±25% Volume/VolumeWater Content: ±5% Volume/ VolumeThe above mentioned Waste shall be treated to reduce the Total Petroleum Hydrocarbon (TPH), as per EPA procedures SW846/8015B and 1664, to below an environmentally acceptable limit of 0.5% Weight/Weight and to satisfactorily dispose of or recycle all recovered solids, liquids and other material used in the performance of the Services in compliance with all applicable environmental laws, regulations and also ADNOC / ADCO guidelines.17. Types of Contamination Level of Contamination(ppm)Achieved Treatment Levels(ppm)1. Drill Cuttings ±250,000 ppm 581 ppm (See Attached)Case Study 210/11/2011 RLC Technologies, Inc. 51. Contract Title: WES2. Client Contact Information: Client name and contact information available upon approved request.7. Contract Location Safat, Kuwait9. Contract Start Date July 200510. Contract Finish Date November 2005 Manufacturing Complete and Plant Shipped11. Quantity Treated (m3) In excess of 75,000 tons12. Treatment Method Thermal Desorption13. Rate of Treatment (m3/hr) 3.5 tons per hour14. Working Hours per Day 2415. Working Days per Week 5.516. Project Description:RLC Technologies contracted to manufacture equipment for WES to process drill cuttings, crude oil and waste from the ’91 war. The RLCT plant has been in continual use and remains in use today, processing these waste streams.RLC Technologies continues to support the equipment by providing technical knowledge as needed, and procuring spare parts for our customer.Cleanup criteria was 1% (~10,000 mg/L)17. Types of Contamination Level of Contamination(mg/L)Achieved Treatment Levels(mg/L)1. Drill Cuttings 89,100 1,300Case Study 310/11/2011 RLC Technologies, Inc. 61. Contract Title: PCI2. Client Contact Information: Client name and contact information available upon approved request.3. Contract Location East Chicago, IN4. Contract Start Date 2/16/20045. Contract Finish Date 10/14/20046. Quantity Treated (m3) Hazardous Materials, Industrial Wastes7. Treatment Method Thermal Desorption8. Rate of Treatment (m3/hr) 1.5 to 2.5 tons per hour9. Working Hours per Day 2410. Working Days per Week 611. Project Description:RLC Technologies was contracted by PCI to supply an ATDU system for a hazardous material recycling facility located in East Chicago. The facility treats and recycles paint waste, resins, polymers, solvent soaked rags, oily wastes, and discarded commercial products. The RLCT plant has been in continual use and remains in use today, processing these waste streams.RLC Technologies continues to support the equipment by providing technical knowledge as needed, and procuring spare parts for our customer.Cleanup criteria was 1% (10,000 ppm)12. Types of Contamination Level of Contamination(WT %)Achieved Treatment Level(mg/L)1. Aromatics (toluene, xylene, etc.)20-60 (see attached)2. Aliphatics (heptane, mineral spirits, etc.)20-60 (see attached)3. Alchohols (methanol, ethanol, etc.)0-25 (see attached)4. Ketones (MEK, acetone, etc.) 5-40 (see attached)5. Esters (methl, acetate, butyl acetate, etc.)0-15 (see attached)6. Chlorinated Solvents (methylene chloride, 1,1,1-trichloroethanne, etc.)0-5 (see attached)Case Study 410/11/2011 RLC Technologies, Inc. 71. Contract Title: PSC2. Client Contact Information: Client name and contact information available upon approved request.3. Contract Location Norco, Louisiana4. Contract Start Date 9/3/20085. Contract Finish Date 10/14/20096. Quantity Treated (m3) >35,000 tons7. Treatment Method Thermal Desorption8. Rate of Treatment (m3/hr) 2.5 to 3.5 tons per hour9. Working Hours per Day 2410.Working Days per Week 511.Project Description:RLC Technologies was contracted by PSC to supply an ATDU system for a hazardous material recycling facility located in Norco, Luisiana. The facility processes refinery waste from the Shell and Valero refineries, as well as outside sources. The RLCT plant has been in continual use and remains in use today, processing these waste streams.RLC Technologies continues to support the equipment by providing technical knowledge as needed, and procuring spare parts for our customer.Cleanup criteria was 1% (10,000 ppm)12.Types of Contamination Level of Contamination(WT %)Achieved Treatment Levels(mg/L)1. Petroleum Hydrocarbon Sludge (PHC)(see attached) (see attached)Before Processing After Processing
Most popular related searches