On-Site Testing Services Brochure

Power: 460 or 575 volt, three-phase power is required to the test trailer power connection. The total amp requirement will be < 20 amps. Water: One 3A" water hose to the trial unit for polymer make-down, steam generation, rotary screen thickener shower water, and wash-down is required. 3. Sludge Supply: A sludge line to the sludge feed tank inlet valve located at the rear of the trailer is necessary. If there are 2 or more materials to be mixed for dewatering, separate lines are required for each sludge, Each trailer carries a portable poly tank which can be used to mix sludges.