Precision Measurement Engineering, Inc. (PME)
PME - Model C-Fluor - Sensor Logger - Manual
PME will provide C-FLUOR Loggers with or without a C-FLUOR sensor installed. The sensor comes with a factory calibration that must be entered into the logger. If PME has supplied the logger with a sensor already installed, there will a PDF of the sensor calibration coefficients located on the logger and PME will have installed this calibration. If you are installing the sensor then you must install the sensor calibration before the system can be used. The logger itself is set to measure temperature and concentration once every 10 minutes and record 1 file of measurements daily. At one measurement every 10 minutes the C-FLUOR Logger will operate for over a year.
Most popular related searches
