Apex Engineering Products Corporation
- Home
- Companies & Suppliers
- Apex Engineering Products Corporation
- Downloads
- RYDLYME PumpMaster - Model 115v - ...
RYDLYME PumpMaster - Model 115v - Pumping Systems - Brochure
RYDLYME dissolves water scale, lime, mudand rust deposits safely, quickly and effectivelyPUMPMASTER SERIES 115vwww.rydlyme.comApex Engineering Products Corporation • 1241 Shoreline Drive, Aurora, IL 60504 • 630-820-8888Please query our qualified technicians regarding our other popular flushing systemsfor your heat exchangers and other vital water cooling equipment.EasyConvenientFastQuietCompactRugged10-29-07Apex Engineering Products Corporation proudlyintroduces our new seal-less magnetic drivePUMPMASTER SERIES of pumps. TheseRYDLYME pumping systems are specificallydesigned to offeryou the besthandling equip-ment available tohelp maintainyour equipment inpeak operatingcondition. Foradded conven-ience, its compactand quiet, energyefficient designsupplements thehigh quality com-ponents and construction. Our PUMPMASTER 115vis a 3/4” seal-less magnetic twin bearing systempump. The PUMPMASTER 115v is a centrifugalpump design with a totally enclosed non-ventilated (TENV) permanent magnetic motorproducing a maximum flow rate of 4.5 gallons perminute This professional pump has a hollowrotating spindle for the internal cooling circuit whichreduces bearingtemperatures andhas few movingparts for easymaintenance ThePUMPMASTER 115vtwin bearing sys-tem handles thrustloads that alsoextend the servicelife of this trust-worthy pump. Theresilience andpermanence ofthis pumping system starts with its 8 gallon HDPEopen head bucket, and continues throughout themesh hoses, tru-union valves, and essential assortedfittings.®RYDLYME PUMPMASTER SERIES 115vPUMPMASTER SET UP:1. Remove all contents from the 8-gallon circulation bucket. This should include two 10’ hoses, a tru-union supply valve, a tru-union returnvalve, bulkhead fittings, assorted accessories kit, and the pump with a 20’ cord. NOTE: Photo is shown with optional third valve.2. Attach both 3/4” bulkhead fittings into the predrilled holes at the top and bottom of the circulation bucket with the bulkhead rubbergasket on the inside wall of the bucket.3. Attach both 3/4” tru-union valves to the newly installed bulkhead fittings via the preinstalled nipples.4. Thread the lower tru-union valve to inlet side of the pump.5. Attach one of the 10’ hoses to the pump discharge. The opposite end of the hose should be fitted to the bottom of the equipment to becleaned. Use the “assorted accessory kit” for additional fittings.6. Screw the union side of the other 10’ hose to the return valve located near the top of the bucket that was attached in step 3. Fit theopposite end of the hose to the top of the equipment to be cleaned. Again, use the accessory kit if necessary.7. Thread the 90° street elbow to the inside of the top bulkhead fitting as an adjustable return spout.8. Check that all connections are secure and all appropriate equipment valves are open.PUMPMASTER PROCEDURES:1. Slowly add prescribed amount of RYDLYME to the 8-gallon circulating bucket. Refer to your RYDLYME literature available atwww.rydlyme.com, your sales representative and/or our technical department, for the proper RYDLYME quantities and dilutions for theapplication being cleaned. NOTE: If recommended quantity exceeds volume of the bucket, it will be necessary to turn on pump at thisstage of the procedure.2. Plug in the pump and periodically check for leaks. Maintain liquid level in the bucket, as a lowering volume indicates an open drain orsystem. Operation levels should be 1/3 of the receiving bucket, the remaining space in the bucket is for foaming and expansion.3. Check circuit again. The RYDLYME solution should flow from the circulation bucket, through the pump and the equipment and back tothe top of the bucket.4. Return discharge foaming indicates active RYDLYME solution and presence of water formed mineral deposits.5. During the cleaning procedure, additional RYDLYME and/or water may be required to maintain circulation. Maintain an adequateliquid level to prevent the pump from cavitating.6. Circulate for recommended number of hours. This can be determined by referring to our literature, our website, or by contacting ourtechnical professionals. When foaming action stops, RYDLYME strength is depleted (two pounds of deposits removed per gallon used)or the equipment being cleaned is free from calcium and other water formed mineral deposits.7. If required, pour in additional material until prescribed quantities have been circulated. If the cleaning solution is expended, add moreRYDLYME to complete the cleaning. Continue to periodically test solution for effectiveness.8. Upon completion, begin your flushing procedure by adding water to the circulation bucket, then disconnect return valve from thecirculating bucket and thoroughly flush. Continue water flushing the equipment for a minimum of 10 minutes or until discharge effluentruns clear.9. RYDLYME is biodegradable, and in most instances may be purged down normal sewers. Check with local authorities before disposingof any complex compositions.10. Turn off water and unplug pump, then immediately close discharge valves to prevent backflow.11. Completely drain pump bucket. Disconnect hoses from equipment and liberally rinse bucket, pump, and associated hosing beforeneatly stowing.12. Return equipment back to efficient service. Thank you for using our safe biodegradable descaler, RYDLYME.PRECAUTIONS:Please review MSDS, specifications, and our website for additional information, or simply call one of our knowledgeable technicalrepresentatives at 800-451-6291.800-451-6291 FAX: 630-820-8886www.rydlyme.com
Most popular related searches
