KATE PMO AG
  1. Companies & Suppliers
  2. KATE PMO AG
  3. Downloads
  4. Shield Placing Mechanism SM 300 ...

Shield Placing Mechanism SM 300 Brochure

Appendix C1 (Shield_Setting_System SM 300).DOC Appendix C1: KA-TE PMO Shield Placing Mechanism SM 300 (Patent EP 674 132) Injecting New Life into the Sewer Application: Attached to the KA-TE PMO Filler Robot SR 300, the patent-protected KA-TE PMO shield placing mechanism SM 300 is used to place shields in sewer pipes with diameter DN 250 to DN 600. Shields are available with various sizes of holes for the renovation of laterals, without holes for the sealing of holes and as closed shields for the injection of joints. Different lengths of belts allow the use in different diameters of the sewers. The expansion and retraction of the shield is powered by electric motors, the attachment and release of the shield by pneumatic latches. Shield and bladder are placed in one go. Technical Specification: Diameter of pipe: 250-800 mm Length: 560 mm Length with Robot: 1170 mm Electric motors: 24V AC Weight: 8 kg Accessories Included: 3 Shields with hole D=100 mm 3 Shields with hole D=120 mm 2 Shields with hole D=150 mm 3 Shields without hole 12 toothed belts for DN 250-350 12 toothed belts for DN 350-450 12 toothed belts for DN 400-500 12 toothed belts for DN 500-600 Approved Method: The KA-TE PMO method of injecting or pressing epoxy resin for the repair of lateral connections underwent external testing by IKT Institut, the independent German Institut for Underground Infrastructure in Gelsenkirchen (www.ikt.de) for standard damage and extreme damage The tests were completed in June 2004 under the title “Repair Methods for Lateral Connections” and the KATE-PMO method achieved the best test results. The system of marking the various methods of sewer renovation by IKT Institut is 1.0 to 1.5 “Very Good” to 5.6 to 6.0 “ Unsatisfactory” Benefits Easy Quick Durable Cost Effective Greater Productivity Environmentally Friendly
Most popular related searches