Pollution & Process Monitoring Ltd

Terminator Brochure

Terminator• Maintenance & pollution containment• Simple activation from any contact closure• Low installation & purchase cost • Rapid response to spillage events• Surface or waste water control• Simple to install• Reliable in operationThe Terminator is an automaticabatement system (PIG) used to contain contamination, ondetection of pollution. It isinexpensive to purchase, simple to install and reliable in operation. It may also be used as a temporary seal to plug a pipe during routine maintenance.• Maintenance & pollution containment• Simple activation from any contact closure• Low installation & purchase cost • Rapid response to spillage events• Surface or waste water control• Simple to install• Reliable in operationPollution and Process Monitoring LtdBourne Enterprise CentreBorough Green Kent TN15 8DGTel: +44 (0) 1732 882044Fax: +44 (0) 1732 780190e-mail: TOC@pollution-ppm.co.ukwww.pollution-ppm.co.ukA Simple Reliable DesignThe system utilises a special bladder manufactured by envirovalveTM,which is pre-installed within a discharge pipe. The bladder automaticallyinflates using compressed air when water pollution is detected, allowingcontainment and remedial action to be taken. Alternatively, the drainagesystem can be designed to divert the pollution over a weir, into a holdingtank for subsequent treatment. The Terminator is therefore an ideallow cost, self-contained solution, to arrest flow wherever there is a risk of contamination affecting local watercourses. It’s simplicityallows for simple installation avoiding expensive civilengineering costs.Externally TriggeredIt may be automatically triggered from any on-linemonitor generating a volt-free alarm output. Typicalwater quality parameters would be pH, Turbidity, or Total Organic Carbon (TOC).Simple To OperateThe surface mounted enclosure provides localindication when the bladder has been inflated.Additional alarms also indicated when there is insufficient pressure available to maintain or inflate the device. Push button control isalso provided to manually inflate and deflatethe bladder. It is recommended that the system be manually activated to ensure it performssatisfactorily, at least on a weekly interval. In the interest of product development the specification of the product may be changed without prior notice to that shown on this data sheet. PPM cannot accept any liability with regards to the operation of the installed system. The one-year’s manufacturers warranty only covers parts.• Range of Bladder sizes to seal 2" to 48" pipes• Operation using site air or integral compressor • Can be triggered remotely via radio/phone link• Manual over-ride with security key operation• Triggered by any pollution monitor / fire alarm• Optional battery back-up protection• Visual & telemetry output to indicate failure to inflate• Excellent sealing properties• Simple & reliable designConnections: 1/4 inch air in fitting (model E), 8mm air out. Bladder Sizes: 50 - 1200mmPressure Relief: Internal pressure relief valve to prevent over pressure.Operating Temp: -40oC to 100oCEnclosure: Solid GRP Dimensions: 310(w) x 365(h) x 220(d) mmPower Supply: 110 / 230VAC / 60 VA or 24VDCSpecificationDescription ModelExternal air at 15psi required. Latched alarm maintains inflated bladder. Terminator-EIExternal air at 15psi required. Released alarm deflates bladder after event. Terminator-ERIntegral compressor provides air supply. Latched alarm maintains inflated bladder. Terminator-ILIntegral compressor provides air supply. Released alarm deflates bladder. Terminator-IR
Most popular related searches