Tigerflow Systems, LLC
- Home
- Companies & Suppliers
- Tigerflow Systems, LLC
- Downloads
- TIGERFLOW - - HVAC Pumping Systems ...
TIGERFLOW - - HVAC Pumping Systems Brochure
????????? ??
?
?????????????????????????? ????
???????????????????????????????????????? ??????????????????? ????????????? ???"#????? $??%????????????&?'?????(???????? ??????????????) ??? ?*?????+??????????????? ?????,???-?.??/???/???????????????????????? ?? ?????0????*??????? ????????10$??$?????????? 23???????? ???????222???????? ??
???????????????????????????????????????????????????????????????????????????? ????????????????????????"???? ?? ??????????????????????????????#??????????????????????????????? ??
?????????? ????????????????????????????????????????????????????"??????????????????????????#???????????????$?%&'$??? ???'???????????????????"???? ????????????????? ??
?????????????????????????????'? ?'?????????????????????????????????????? ??????#??????????????????????????????(???????????????#?)???????????????????????????? ????????????????????? ??
???*?????????????????????? ????+???#
??????"??????????????????????????? ????????????????????????????????????????????????????????????????????????????????#??? ??
?,???*????????????????????'?????%????'???????????????????? ???????? ??????# - ) .? /?0?1???
?????????? ??"?#?"$??%?&?$?????'??&?%?&?$???&?()?"???%?"*$?+??,??*%????%??"?-?+4%)(?3'??5????%6?????????(???%????????? ?? 2223????????.?????????-6??4?????????????/????10$????????? ?? 78#""9 :#; <:?????????
???????????(?????? 1????(??? ?????%???$@?*????? .?????????????? ??????? ????????9? ??4??????1?&???A???????=0B ?$0B ??B ??B??? ???? ????????????????? ?4?????4????C????"??#?=1??0??05 ??D?? ?? "????4????C????"??#?=01?05?$0 ?$D?? ??"??2??+???????????????'???9????????/??????? ??(??4?1??? ????6??9???????< ???
??? -???????-?????+
??? ??< ?????? ?????? "? ???(?? ?&?'?=1???9??????6?"????????(?'??????? ?????????? ??????%????? ?????????1? ??????+4%)(?3'???? ?%? ;""" 4?5?????6?4???????? ????+'?8??
????)???? ????,? ????+4%)(?3'???? ?%? ;""" 10$? ?%??
???610$???????????? ??.
59
?????8?7?
&??????????????????????????????????????????????????????? ?? ?????????????????"????????????###@ ??????????????????????????????????????1?&???????"A?? ??????????? A)???????????#@ ?????????????????????????1?????????????????????????????????????????????????#@ ???????'????????????????"??????????????????@ ???????1?????????'???????????????????????????????????????????????????#@B ???*???????1???????? ??
?????????????????????????*??<=>&??????????????????????*?????????????????????????????????#@ ?????????????????????????"???????????????????????????????#?+4%)(?3'?10$???? ?? ?=????????)?????)?????????-??????=????????)?????-???????-??????& ?????%0??????&???????2)????????6&??????????????-????????????-??????%)?????????-?????????????A?(????-??(?????????????????-??(?????????????=?????&??????????????????&?????? ??????A??????????)??????&??????????????????/???????????-???????)?????????&?????? ??????A??????????)?????????????????+4%)(?3'?????????? ?#?$?????+???????'$???'?'%?60????????'?'%?6?#%??$???&???&??%???&0?"%''???"$??%??&%#?,$??0?$????'%?????%??$?%???????#$"?0?&?$????'?'(?$???;?6?$?-A??(????'?&????????)???????=????????=?????"?&????????????&??????A??(?????'???????&??????A??(?=?'?=????????)????"?=????????=?????"?&???????-???????A??(?=??'?=????????)????"?0???? ???????????????????????????? ??????????&??????"?????????????&??????"?&????????????&??????"?>?????????=?????&??????A??(?=???'?=????????)????"?=????????-??????"?& ?????)????????"?0??????)????????"?>?????????=?????&???????+4%)(?3'???? ?
?? <""" 10$????*???????????????????????????? ??????0????*??????????????? ????4
5?4
5?4
????'$?65722
???"%??$?6?????8??959?????-32532539????'$?6577?577?577???5&?8?7245..:?;?$???????????????????1=?+4%)(?3'0????*?????????????'????????????? ????+??<&??6???$?;???%??????$??0???0???%"?&&?%???%?0?.
?*>???%????? ?????????1? ??????+4%)(?3'???? ?%? ;""" 4?5?????6?4???????? ????+'?8??
????)???? ????,? ????+4%)(?3'???? ?%? ;""" 10$? ?%??
???610$???????????? ??.
59
?????8?7?
&??????????????????????????????????????????????????????? ?? ?????????????????"????????????###@ ??????????????????????????????????????1?&???????"A?? ??????????? A)???????????#@ ?????????????????????????1?????????????????????????????????????????????????#@ ???????'????????????????"??????????????????@ ???????1?????????'???????????????????????????????????????????????????#@B ???*???????1???????? ??
?????????????????????????*??<=>&??????????????????????*?????????????????????????????????#@ ?????????????????????????"???????????????????????????????#?+4%)(?3'?10$???? ?? ?=????????)?????)?????????-??????=????????)?????-???????-??????& ?????%0??????&???????2)????????6&??????????????-????????????-??????%)?????????-?????????????A?(????-??(?????????????????-??(?????????????=?????&??????????????????&?????? ??????A??????????)??????&??????????????????/???????????-???????)?????????&?????? ??????A??????????)?????????????????+4%)(?3'?????????? ?#?$?????+???????'$???'?'%?60????????'?'%?6?#%??$???&???&??%???&0?"%''???"$??%??&%#?,$??0?$????'%?????%??$?%???????#$"?0?&?$????'?'(?$???;?6?$?-A??(????'?&????????)???????=????????=?????"?&????????????&??????A??(?????'???????&??????A??(?=?'?=????????)????"?=????????=?????"?&???????-???????A??(?=??'?=????????)????"?0???? ???????????????????????????? ??????????&??????"?????????????&??????"?&????????????&??????"?>?????????=?????&??????A??(?=???'?=????????)????"?=????????-??????"?& ?????)????????"?0??????)????????"?>?????????=?????&??????Bulletin HVAC0905-5MPrinted In USATotal System: Design, Specification& ManufacturingTotal System Third Party UL/C-UL CertifiedUL/C-UL 508 PanelsASME Code Section 9 WeldingFactory TestedSingle Source ResponsibilityInternational Sales & Service NetworkPackaged Pumping & Control Systemsfor Variable & Constant SpeedHVAC Applications.Our promise to you...Your TIGERFLOW factory engineered system will arrive ready togo and operate reliably to the required specifications, with thesimplest of site installation.Full performance testing at TIGERFLOW before shipping providescritical advantages for system owners, designers and contractors.In addition to UL/C-UL third-party certification, each factory builtTIGERFLOW system is tested to meet in-the-field operatingspecifications before shipment. Liability and performance risksare eliminated. System designers appreciate the time savingsand TIGERFLOW expertise built into each project.On time, every time deliveries of third party certified systemseliminate contractor performance penalties and delays.TIGERFLOW’s expertise renders site-built/site-certifiedsystems a thing of the past.REPRESENTED BY:© 2005 TIGERFLOWSpecifications and dimensions are subject to change without notice.TIGERFLOW, Your Expert Source ForEngineered Systems...On the Prowl for the Next Generation ofPackaged HVAC Pump Systems?Facility• Over 36,000 sq ft• 3rd Party Total System Certified - UL/C-UL ListedSystems• Full Performance Testing: 10,000+ GPM Flow Rate• ASME Section 9 Certified Welding• 5 Ton Bridge Crane• 24' Clear Height Ceilings• 8 Bay Loading Dock• 16' x 14' Loading door with ramp for oversize systems• Fully Enclosed Coating Facility - double door, withinfrared heatersFull Performance System Test Rig• 10,000+ GPM Flow Rate• 400 PSI Discharge Pressure• 8000 Gallon Test Tank (NSF coated for domestic water)• 4-Flow Sensors +/- 1% Accuracy• 5- Pressure Transducers• Test Loops, Schedule 40 Galv. Steel (20", 12", 6", 3")Master Test & Control Panel• Three Phase Voltages: (460/230/208, 3Ø)• Single Phase Voltages: (240/208/120, 1Ø)• Tiger's Eye Solid State Microprocessor Based Panelwith 4 Line LCD Operator Interface• Wire-to-Water Efficiency Indication/Testing• Flow in GPM (4 Separate Digital Flow Meters)• Pressure in PSI & Feet TDH• KW, Amperage, Voltage• X-Y System Performance Testing/Test Report• All flow meters, flow sensors, pressure sensors,pressure gauges, electrical instrumentation andelectrical meters are all independently calibrated andall traceable to NIST4034 Mint Way • Dallas, TX 75237(800) 783-6756Tel: (214) 337-8780 • Fax: (214) 333-2742www.TIGERFLOW.comE-mail: sales@TIGERFLOW.comSPEC ES-3200-FC-VFDMay 2006Page #14034 Mint Way, Dallas, TX 75237 • (800) 783-6756 • Tel: (214) 337-8780 • Fax: (214) 333-2742E-Mail: sales@tigerflow.comDATE:PROJECT:ENGINEER:REP:SPECIFICATION FOR PRE-PACKAGED VARIABLE SPEEDDUPLEX CHILLED WATER PUMPING SYSTEMFurnish and install a TIGERFLOW Series ES-3000-FC-VFD, duplex variable speed, U.L./C-U.L.Listed Engineered packaged chilled water system. The system shall be rated for a system flow of ____GPM at a system pressure of ____ PSIG.MANUFACTURERSA. Base Bid1. TIGERFLOW Systems, Inc.2. Systecon3. ITT/Bell&GossettB. Alternates. Manufacturers must submit a request in writing for prior approval to the engineerten (10) days prior to the bid date.Request must include:-Complete submittal for prior approval-System drawings-Electrical drawings-Full cut sheets-Written and sealed statement from corporate officer stating compliance including any and allexceptions-Current list of similar installation with contact names, phone and fax numbers.PUMP(S) & MOTOR(S)Pump(s) shall be ______________________________ bronze fitted, mechanical seal, frame mounted,end suction pumps. Each pump shall be floor coupled to an ____ RPM, 460/3/60, 1.15 service factor,ODP premium efficiency motor. (Pump, base, coupling, and guard)CHWP No. 1 & 2 Model _______, ___ GPM at ___’ TDH, ___ HP 100% standbySPEC ES-3200-FC-VFDMay 2006Page #24034 Mint Way, Dallas, TX 75237 • (800) 783-6756 • Tel: (214) 337-8780 • Fax: (214) 333-2742E-Mail: sales@tigerflow.comVALVESCheck ValvesEach pump discharge shall be fitted with a 4” wafer style, center guide, non-slam check valve.Suction DiffuserEach pump suction shall be fitted with a 4x4” angle pattern suction diffuser complete with flowstraightening vanes and start-up strainer with manual blow down valve.Butterfly Isolation ValveEach pump suction shall be fitted with (2) 4” fused epoxy lug style butterfly isolation valves. Valveshall be rated for a minimum of 200 PSI.GAUGESProvide common gauge stand complete with (4) 4 _ ” diameter, stainless steel gauges complete withshut-off and vent cocks.CONTROLSProvide a U.L./C-U.L., NEMA 4 Power and Control center with: TIGERFLOW MARK VI micro-controller utilizes the latest in 8051 micro-processor technology. This solid state controller has an easyto use 20 key push button keypad, with tactile feedback. The micro-controller has a four line, 20character display, which displays the users input and systems current condition.Standard features on all Mark VI controllers:? NEMA 4 carbon steel enclosure? U.L./C-U.L. 508 label? Customer Specific Programs? Variable Speed Applications? 16 discrete I/O per each digital I/O board? 8 Optically Isolated inputs? 8 Form C Relays rated at 8 Amps resistive @ 120 Vac.? 12 analog channels (4 outputs & 8 inputs) per each analog I/O board (all inputs are scalable)? Universal Inputs (4-20 MA, 1-5 VDC, 0-10 VDC, 2-10 VDC)? Outputs of 1-5,0-10,2-10 VDC? Multiple board configurations? Standard 3 Board Configuration, additional I/O boards can be added to any controller? Menu driven operator interface? Multiple level password protection? Built in calibration routines? Remote EnableSPEC ES-3200-FC-VFDMay 2006Page #34034 Mint Way, Dallas, TX 75237 • (800) 783-6756 • Tel: (214) 337-8780 • Fax: (214) 333-2742E-Mail: sales@tigerflow.com? Individual pump run indicator? Individual ETMs? Hand-Off-Auto selector switches? Power on light? Alarm horn and reset button? 14 V U.L./C-U.L. CE approved switching power supply. Unit must have built-in breaker barwith over demand protection? 120/1/60 control circuit transformer? Operator adjustable alarm settings? Temperature? Flow? Transducer failure alarms? Communication alarms? Best Efficiency combination flow and PID pump control sequencing? Individual pump failure alarms with differential pressure switches and TDR’s? End-of-curve protection? Individual zone failure alarms? Pump start counters and timers? Pump alternation (24 Hour or Sequential)? Independent time delays? Real time clock? Main program stored in EPROM? Data stored in EEPROM? Individual auxiliary alarm contactsCONTROL SEQUENCEA. The Mark VI Controller shall start and stop each pump and vary their speed based on systemrequirements. The controller shall maintain three (1) remote differential pressure zone.B. The controller shall continually monitor flow and each differential pressure transmitter. Thesystem shall operate to satisfy the differential pressure transmitter that is below its set point andvary the speed accordingly.C. In the hand position, the controller will run all the main pumps (not standby) at a speed designated via the controller keypad.(2) Thru door fused disconnects & fuses(1) Incoming power & distribution lugSPEC ES-3200-FC-VFDMay 2006Page #44034 Mint Way, Dallas, TX 75237 • (800) 783-6756 • Tel: (214) 337-8780 • Fax: (214) 333-2742E-Mail: sales@tigerflow.comVARIABLE SPEED DRIVESProvide ____ (qty), _____________, ___ V, ___ PH, ___ HZ U.L./C-U.L. listed, IBGT PWM, variablespeed drives with-U.L./C-U.L label-VFD start/stop-Speed reference-Fault diagnostics-Meter points:Motor power in HPMotor power in KWMotor KW-HRMotor currentMotor voltageHours runFeedback signal 1 & 2DC link voltageThermal load on motorThermal load on VFDHeat sink temperatureREMOTE DIFFERENTIAL PRESSURE TRANSMITTERSProvide one (1) ______________________ differential pressure transmitters for remote mounting byEMS contractor.-Each transmitter shall be pre-calibrated for the design range-Minimum accuracy of +/- 0.25% of calibrated span-2000 PSI over pressure-All welded parts to be stainless steel with housing clearly marked with high pressure and lowpressure parts.-Units shall be housed in waterproof enclosure with NPT female pipe ports and NPT conduitport.-4.20MAFACTORY PREFABRICATIONProvide each system as a complete package system on a structural steel mounting frame, piped, tubed,mounted and wired. Unit shall be factory primed and painted with machine grade finish coat. Allwelding shall be performed by ASME Section 9 certified welders. System shall be (Horizontal)construction.Suction, discharge headers and flowsensor loop shall be: ___” (Schedule 40 Black Steel with Class 150Flanges).SPEC ES-3200-FC-VFDMay 2006Page #54034 Mint Way, Dallas, TX 75237 • (800) 783-6756 • Tel: (214) 337-8780 • Fax: (214) 333-2742E-Mail: sales@tigerflow.comTHIRD PARTY REQUIREMENTSThe package shall be UL Listed as a system for its intended use, so meeting OSHA Federal Regulations29 CFR 1910.303 and 399 as well as NFPA Pamphlet #70 (National Electric Code) Article 90-7, Cityof Los Angeles Approval Code, CMR248 Massachusetts State Plumbing Code Approval.FACTORY TESTThe package shall be electrically, hydrostatically and run tested before shipment, with an x-y testreport. All flow meters, flows sensors, pressure gauges, electrical instrumentation and electrical metersare all independently calibrated and all traceable to NIST.STARTUPThe factory authorized local representative shall provide startup and acceptance testing in accordancewith requirements.WARRANTYEach TIGERFLOW system shall be warranted for a period of (18) months from date of shipment or(12) months from date of startup, whichever occurs first.SUBMITTALS & INSURANCE CERTIFICATIONSSubmittals shall be in accordance with requirements of general specifications. Submit 6 copies to theengineer for approval. All submittals must include the following:• Complete shop drawings and complete wiring diagrams. All drawings must beAUTOCADD Release 2000; complete with full mechanical Desk Top 3-D drawings in bothhardcopy and disk format. Complete operating and maintenance instructions.• Furnish written certification of the manufacturers listing with Underwriters Laboratories asan approved manufacturer of control panels.• Furnish written certification that the manufacturer is listed by UL/C-UL as an approvedmanufacturer of factory assembled pumping systems.• A complete, easily readable functional description of the proposed equipment.• Upon completion of the installation, the results of the field and acceptance tests as specifiedunder this section of the specification shall be submitted to the engineer.• Furnished written certification from the manufacturers representative of the properinstallation of the station.• Provide written certification that, a nationally recognized manufacturer of package pumpsystems, manufactures the pump system. A corporate officer must sign this certification.• Operation and maintenance manuals:Submit complete operations and maintenance information for this specific equipment. Theengineer shall review these manuals for completeness. They shall include complete parts listincluding manufacturers reference and ordering number, the local representative name,address and phone number, the model and serial number of the system.• The manufacturers shall submit a certificate of product liability insurance for no less thanone million dollars ($1,000,000)SPEC ES-3200-FC-VFDMay 2006Page #64034 Mint Way, Dallas, TX 75237 • (800) 783-6756 • Tel: (214) 337-8780 • Fax: (214) 333-2742E-Mail: sales@tigerflow.comQUALITY ASSURANCE• All equipment under this section shall be furnished by a single supplier and shall beproducts that the manufacturer regularly engages in. The supplier shall have soleresponsibility for proper functioning of the system and equipment supplied.• Equipment shall be a manufacturer’s standard product presently in commercial production.• The manufacturer shall have in place a quality assurance program to assure the quality of thematerial furnished.QUALIFICATIONS• The manufacturer shall have a minimum of ten years manufacturing and applicationexperience.• Upon request from the engineer, the pump station manufacturer shall demonstrate proof offinancial responsibility with respect to performance and delivery date.• Upon request from the engineer, the pump station manufacturer shall provide proof orevidence of facilities, equipment and skills required to produce the equipment specifiedherein.SPECIFICATION 3200-IL-VFD-PEC8/8/2006Page 14034 Mint Way, Dallas, TX 75237 • (800) 783-6756 • Tel: (214) 337-8780 • Fax: (214) 333-2742E-Mail: sales@tigerflow.comDATE:PROJECT:ENGINEER:REP:SPECIFICATION FOR PRE-PACKAGED VARIABLE SPEEDDUPLEX CHILLED WATER PUMPING SYSTEMCOMPLETE WITH PREFABRICATED ENVIRONMENTALENCLOSURE END SUCTION WATER BOOSTER SYSTEMFurnish and install a TIGERFLOW Series ES-3000-IL-VFD-PEC, duplex variable speed, U.L./C-U.L.Listed Engineered packaged chilled water system complete with prefabricated environmental enclosure.The system shall be rated for a system flow of ____ GPM at a system pressure of ____ PSIG.MANUFACTURERSA. Base Bid1. TIGERFLOW Systems, Inc.2. Systecon3. ITT / Bell & GossettB. Alternates. Manufacturers must submit a request in writing for prior approval to the engineerten (10) days prior to the bid date.Request must include:-Complete submittal for prior approval-System drawings-Electrical drawings-Full cut sheets-Written and sealed statement from corporate officer stating compliance including any and allexceptions-Current list of similar installation with contact names, phone and fax numbers.SPECIFICATION 3200-IL-VFD-PEC8/8/2006Page 24034 Mint Way, Dallas, TX 75237 • (800) 783-6756 • Tel: (214) 337-8780 • Fax: (214) 333-2742E-Mail: sales@tigerflow.comPUMP(S) & MOTOR(S)Pump(s) shall be ________ Series Model ______________ cast iron, bronze fitted, mechanical seal,vertical split-coupled inline pumps. Each pump shall be split coupled to an ____ RPM, ____ V ___ PH____ HZ, 1.15 service factor, ODP premium efficiency motor.CHWP No. 1 & 2 Model ______________, ____ GPM at ____’ TDH, ____ HP 100% standbyVALVESTriple Duty ValvesEach pump discharge shall be fitted with a 6” flanged angle pattern combination balancing, non-slamcheck and shut off triple duty valve.Suction DiffuserEach pump suction shall be fitted with a 6x5” angle pattern suction diffuser complete with flowstraightening vanes and start-up strainer with manual blow down valve.Butterfly Isolation ValveEach pump suction shall be fitted with fused epoxy lug style butterfly isolation valve with gearoperator. Valve shall be rated for a minimum of 200 PSI.GAUGESProvide common gauge stand complete with (4) 4” diameter liquid filled, stainless steel gaugescomplete with shut-off and vent cocks.AIR SEPARATORProvide an 8” flanged 125# ASME code/NB stamped tangential air separator. Air separator shall beprovided with an automatic air release valve and isolation shut off ball valve and drain ball valve.EXPANSION TANKProvide a Model FA-300, 82 gal, 125# ASME Code/NB stamped, full acceptance bladder tank withreplaceable heavy-duty butyl rubber bladder.EXPANSION TANK PIPINGProvide air separator and expansion tank piping with full port isolation ball valvesSHOT FEEDERProvide a 5 gallon chemical shot feeder complete with _” schedule 40 steel piping, (2) _” full port ballisolation valves and (1) _” full port ball drain valve.SPECIFICATION 3200-IL-VFD-PEC8/8/2006Page 34034 Mint Way, Dallas, TX 75237 • (800) 783-6756 • Tel: (214) 337-8780 • Fax: (214) 333-2742E-Mail: sales@tigerflow.comGLYCOL SYSTEM(1) TIGERFLOW Series ES-3000-GLY, UL/C-UL listed, engineered packaged simplex glycolsystem, consisting of:Condition Point: ____ GPM @ ____ PSI(1) MTH Series, Model 31, all bronze construction, mechanical seal, pump, close-coupledto a ____ hp ____ RPM, ___ V ___ PH ___ HZ, ODP high efficiency motor*Condition Point: ____ GPM @ ____’ TDH(1) 55 gallon polyethylene glycol tank with cover(1) 1” non-slam check valve(2) 1” full-port ball valve(1) Low level float switch(1) Model 530C adjustable relief valve(1) 2-1/2” diameter glycerine filled pressure gauge with gauge cock(1) U.L. Listed, Nema 4, power and control panel(*) U.L./C-U.L. 508 Label-Pressure Sequencing with Mercoid DA pressure switch and TDR-Pump Run Indication-H-O-A Selectors-Low-level alarm with TDR(1) Thru Door Disconnect(s) with Individual Motor Circuit Protection(1) FVNR magnetic starters with Overload Protection(1) Power on Light(1 set) 1” Schedule 40 poly piping(1) Steel system skid with all necessary pipe supports, tubing and wiring for complete package.(1) Model St-12, 4.4 gallon, 150# Non-ASME Code bladder tank – skid mounted(*) All welding to be done by ASME Section 9 certified welders(*) Unit to be factory primed and painted with machine grade finish coatSystem to be completely, electrically, hydrostatically, and run tested before shipment.SPECIFICATION 3200-IL-VFD-PEC8/8/2006Page 44034 Mint Way, Dallas, TX 75237 • (800) 783-6756 • Tel: (214) 337-8780 • Fax: (214) 333-2742E-Mail: sales@tigerflow.comCONTROLSProvide a U.L./C-U.L., NEMA 4 Power and Control center with: TIGERFLOW MARK VI micro-controller utilizes the latest in 8051 micro-processor technology. This solid state controller has an easyto use 20 key push button keypad, with tactile feedback. The micro-controller has a four line, 20character display, which displays the users input and systems current condition.Standard features on all Mark VI controllers:? NEMA 4 carbon steel enclosure? U.L./C-U.L. 508 label? Customer Specific Programs? Variable Speed Applications? 16 discrete I/O per each digital I/O board? 8 Optically Isolated inputs? 8 Form C Relays rated at 8 Amps resistive @ 120 Vac? 12 analog channels (4 outputs & 8 inputs) per each analog I/O board (all inputs are scalable)? Universal Inputs (4-20 MA, 1-5 VDC, 0-10 VDC, 2-10 VDC)? Outputs of 1-5,0-10,2-10 VDC? Multiple board configurations? Standard 3 Board Configuration, additional I/O boards can be added to any controller? Menu driven operator interface? Multiple level password protection? Built in calibration routines? Remote Enable? Individual pump run indicator? Individual ETM s? Hand-Off-Auto selector switches? Power on light? Alarm horn and reset button? 14 V U.L./C-U.L. CE approved switching power supply. Unit must have built-in breaker barwith over demand protection? 120/1/60 control circuit transformer? Operator adjustable alarm settings? Temperature? Flow? Transducer failure alarms? Communication alarms? Best Efficiency combination flow and PID pump control sequencing? Individual pump failure alarms with differential pressure switches and TDRs? End-of-curve protection? Individual zone failure alarms? Pump start counters and timers? Pump alternation (24 Hour or Sequential)? Independent time delays? Real time clock? Main program stored in FLASH? Data stored in EEPROM? Individual auxiliary alarm contactsSPECIFICATION 3200-IL-VFD-PEC8/8/2006Page 54034 Mint Way, Dallas, TX 75237 • (800) 783-6756 • Tel: (214) 337-8780 • Fax: (214) 333-2742E-Mail: sales@tigerflow.comCONTROL SEQUENCEA. The Mark VI Controller shall start and stop each pump and vary their speed based on systemrequirements. The controller shall maintain three (3) remote differential pressure zones incombination with one (1) system mounted flow station.B. The controller shall continually monitor flow and each differential pressure transmitter. Thesystem shall operate to satisfy the differential pressure transmitter that is below its set point andvary the speed accordingly.C. In the hand position, the controller will run all the main pumps (not standby) at a speeddesignated via the controller keypad.INCOMING POWER LUG BOXProvide a NEMA 4, U.L./C-U.L. incoming power and distribution lug panel.VARIABLE SPEED DRIVESProvide ____ (QTY), Drive manufactured by ____________________ U.L./C-U.L. listed, NEMA 1,IBGT PWM, variable speed drives with-U.L./C-U.L label-NEMA1-Thru door circuit breaker-VFD start/stop-Speed reference-Fault diagnostics-Meter points:Motor power in HPMotor power in KWMotor KW-HRMotor currentMotor voltageHours runFeedback signal 1 & 2DC link voltageThermal load on motorThermal load on VFDHeatsink temperatureREMOTE DIFFERENTIAL PRESSURE TRANSMITTERSProvide three (3) Siemens Sitran or Rosemont 1151-DP differential pressure transmitters for remotemounting by EMS contractor.-Each transmitter shall be pre-calibrated for the design range-Minimum accuracy of +/- 0.25% of calibrated span-2000 PSI over pressureSPECIFICATION 3200-IL-VFD-PEC8/8/2006Page 64034 Mint Way, Dallas, TX 75237 • (800) 783-6756 • Tel: (214) 337-8780 • Fax: (214) 333-2742E-Mail: sales@tigerflow.com-All welded parts to be stainless steel with housing clearly marked with high pressure and lowpressure parts.-Units shall be housed in waterproof enclosure with NPT female pipe ports and NPT conduitport.-4.20MAFLOW SENSORProvide a model 225B paddlewheel insertion type flowsensor.-This flowsensor shall be system mounted in a flow loop.-Flowsensor shall be provide with a hot tap gate valve assembly for flowsensor removal.-Flowsensor shall have +/-1% flow rate accuracy.FACTORY PREFABRICATIONProvide each system as a complete package system on a structural steel mounting frame, piped, tubed,mounted and wired. Unit shall be factory primed and painted with machine grade finish coat. Allwelding shall be performed by ASME Section 9 certified welders. System shall be (Horizontal)construction.Suction, discharge headers and flowsensor loop shall be: 8” (Schedule 40 Black Steel with Class 150Flanges).PREFABRICATED ENVIRONMENTAL ENCLOSUREGeneralProvide as part of the packaged system, a completely pre-fabricated environmental enclosure,including, but not limited to: Size: 9’ W x 19’ L x 11’-3” H +/- buildings of smaller size will not beconsidered.Panel ConstructionInsulated panels shall be fabricated with metal pans adhered securely to interior and exterior of panel tocompose tough, resilient, shock-resisting surface. All panels shall exhibit 100% urethane poured-in-place, exclusive of metal pans, perimeter bracing and metal fasteners. Perimeter bracing shall be #2grade, SPF specie wood, tongue-and-grooved for proper alignment and positive sealing. Overallcoefficient of heat transfer (“U” Factor) shall not exceed 0.029, R30 for 3-1/2” thick panels and R-42for 5” thick panels. Nominal panel dimensions shall be fabricated as required. Standard panel widthshall be r-foot (nominal). All perimeter bracketing shall be chemically pressure treated.FinishMetal finishes shall provide optimum protection plus superior resistance to chemical corrosion andultraviolet (UV) radiation. Finished shall maintain complete adhesion to foam insulation. Finishes forboth interior and exterior shall be one or combination of following (Select one):Galvanized steel:White (polyester) stucco embossed 24 gaugeSand tan (polyester) stucco embossed 24 gauge (Standard)SPECIFICATION 3200-IL-VFD-PEC8/8/2006Page 74034 Mint Way, Dallas, TX 75237 • (800) 783-6756 • Tel: (214) 337-8780 • Fax: (214) 333-2742E-Mail: sales@tigerflow.comPanel FastenersProvide factory installed cam-lock fasteners. Each cam-lock fastener shall provide a tight and positiveseal. Fastener material shall be steel housing, hook and pin with high pressure die-cast zinc cam.Hardened steel hexagonal wrench is used to tighten panel fasteners. The hook of the fastener shallengage over the pin when rotating the wrench and with cam-action, draw the panels tightly together.Opaque white, gray or tank polyethylene snap-in caps cover the wrench hole borings.Panel GasketsEach joint shall exhibit a polyvinyl chloride (PVC) serrated bulb type, double lined, compressiongasket to eliminate water vapor permeability. All gaskets are factory installed and require no additionalhandling. Gaskets shall be resistant to chemical corrosion and ultraviolet radiation. Gasket operatingtemperature shall be -34° C to 71° C (-30° F to 160° F).InsulationInsulation shall be thermosetting type polyurethane polymer rigid foam and produced by the reaction ofpolyisocyanuratess with polyether-based resins. Insulation shall be 3-1/2” or 5” thick form, 2.0 lb. Percu. ft. Density (poured=in-place, not frothed) according to ASTM C303. The thermal conductivityinitial “K” factor shall be 0.118 BTU per house (square foot) (degrees Fahrenheit per inch) according toASTM C518. Insulation shall remain stable within operating temperature -68° C to 121° C (-90° F to250° F).Metal Commercial DoorsDoor shall be seamless, constructed of two face sheets of 18 gauge cold rolled steel, stretcher-leveledquality or flatness. Vertical edges of doors shall have neat hemmed edge. Seam mechanicallyinterlocked for maximum structural integrity. All hinge reinforcements shall be of 8 gauge steelprojection welded to door.Standard frames shall be 16-gauge cold rolled steel. Frames shall be mitred, face welded and groundsmooth. All hinge reinforcements shall be of 8 gauge steel projection welded to frames.Reinforcements for strike and surface mounted hardware shall be minimum for 14 gauge. Frames shallbe furnished with factory installed rubber mutes, 3 per strike jamb. All frames shall be factory-installedinto the wall panels (door section).Doors and frames shall be painted as specified. Door hardware including pinned butt hinges withindividual latch set and various accessories, if required, for both interior and exterior doors as follows:(1) 3-0’ single leaf metal commercial door with view glass window(1) 6’ x 7’ double leaf metal commercial door with view glass window(2) Hinges: 1-1/2 pair (per door), 4-1/2” x 4-1/2”, brush chrome finish (US 26D)(3) Passage latch set: cylindrical, brushed chrome finish (US 26D)(4) Head bolt: 6” long with 24” chain, cadmium finish(5) Foot bold: 6” long, cadmium finish(6) Weather-stripping: vinyl in an aluminum frame(7) Threshold: aluminumU.L. ListedClassified insulated panels by Underwriter’s Laboratories, standard testing for surface burningcharacteristics of building materials (UL-723).SPECIFICATION 3200-IL-VFD-PEC8/8/2006Page 84034 Mint Way, Dallas, TX 75237 • (800) 783-6756 • Tel: (214) 337-8780 • Fax: (214) 333-2742E-Mail: sales@tigerflow.comCaulking & SealantsInsulated panels shall be set on galvanized “Z” base trim with non-drying butyl caulking. All openingsand penetrations through insulated panels shall be sealed with silicone sealant. Clean and degreaseapplicable surfaces.Roof SystemA pre-fabricated roof system shall be provided for the enclosure to provide a waterproof andultraviolet-proof covering for insulated ceiling panels. Roof system shall be galvanized standing seam,22 gauge, 16 inches wide, sheet metal over ceiling panels with a slope of _” per foot. Fasteners shall becorrosion resistant rubber washered tek screws with length and strength required for metal to befastened.Installed Accessories(1) 460/3/60 load center(1) 7-1/2 KVA combination transformer with circuit breaker panel complete with (1) 30 amp mainbreaker, (1) 40 amp secondary breaker and (8) 20 amp 120 V circuit breakers(1) Unit heater with thermostat: 5KW, 460/3/60(1) Exhaust fan with thermostat 120/1/60(1) Motorized louver (spring open/power close)(1) Exterior mounted light with photocell(3) 40W fluorescent light fixtures and bulbs(2) GFCI convenience outlets, 120/1/60(1) 4” floor drain piped to edge of skid(*) All drain lines piped to floor drain(*) Wall penetration sleeves as requiredFACTORY PREFABRICATION(1) 10” rectangular perimeter, with diamond plate floor design skid base complete with allnecessary sensing lines, pipe supports and wiring for complete package system. All welding tobe done by ASME Code Section 9 certified welders.THIRD PARTY REQUIREMENTSThe package shall be UL Listed as a system for its intended use, so meeting OSHA Federal Regulations29 CFR 1910.303 and 399 as well as NFPA Pamphlet #70 (National Electric Code) Article 90-7, Cityof Los Angeles Approval Code, CMR248 Massachusetts State Plumbing Code Approval.FACTORY TESTThe package shall be electrically, hydrostatically and run tested before shipment, with an x-y testreport. All flow meters, flow sensors, pressure gauges, electrical instrumentation and electrical metersare all independently calibrated and all traceable to NIST.SPECIFICATION 3200-IL-VFD-PEC8/8/2006Page 94034 Mint Way, Dallas, TX 75237 • (800) 783-6756 • Tel: (214) 337-8780 • Fax: (214) 333-2742E-Mail: sales@tigerflow.comSTARTUPThe factory authorized local representative shall provide startup and acceptance testing in accordancewith GM requirements.WARRANTYEach TIGERFLOW system shall be warranted for a period of (18) months from date of shipment or(12) months from date of startup, whichever occurs first.SUBMITTALS & INSURANCE CERTIFICATIONSSubmittals shall be in accordance with requirements of general specifications. Submit 6 copies to theengineer for approval. All submittals must include the following:• Complete shop drawings and complete wiring diagrams. All drawings must beAUTOCADD Release 2000; complete with full mechanical Desk Top 3-D drawings in bothhardcopy and disk format. Complete operating and maintenance instructions.• Furnish written certification of the manufacturers listing with Underwriters Laboratories asan approved manufacturer of control panels.• Furnish written certification that the manufacturer is listed by UL/C-UL as an approvedmanufacturer of factory assembled pumping systems.• A complete, easily readable functional description of the proposed equipment.• Upon completion of the installation, the results of the field and acceptance tests as specifiedunder this section of the specification shall be submitted to the engineer.• Furnished written certification from the manufacturers representative of the properinstallation of the station.• Provide written certification that, a nationally recognized manufacturer of package pumpsystems, manufactures the pump system. A corporate officer must sign this certification.• Operation and maintenance manuals:Submit complete operations and maintenance information for this specific equipment. Theengineer shall review these manuals for completeness. They shall include complete parts listincluding manufacturers reference and ordering number, the local representative name,address and phone number, the model and serial number of the system.• The manufacturers shall submit a certificate of product liability insurance for no less thanone million dollars ($1,000,000)QUALITY ASSURANCE• All equipment under this section shall be furnished by a single supplier and shall beproducts that the manufacturer regularly engages in. The supplier shall have soleresponsibility for proper functioning of the system and equipment supplied.• Equipment shall be a manufacturer’s standard product presently in commercial production.• The manufacturer shall have in place a quality assurance program to assure the quality of thematerial furnished.SPECIFICATION NO. 6100.2May 2006PAGE 14034 Mint Way, Dallas, TX 75237 • (800) 783-6756 • Tel: (214) 337-8780 • Fax: (214) 333-2742E-Mail: sales@tigerflow.comDATE:PROJECT:ENGINEER:REP:SPECIFICATION FORHORIZONTAL SPLITCASE PUMP SYSTEMSIMPLEX, DUPLEX, TRIPLEXFurnish and install a TIGERFLOW Series DSP-6000, (Simplex) (Duplex) (Triplex) U.L./C-U.L. ListedEngineered packaged pump system. The system shall be rated for a system flow of _____GPM at asystem pressure of _____PSIG including a suction pressure of _____PSIG minimum, _____PSIGmaximum.PUMP(S) & MOTOR(S)Pump(s)Pumps shall be vertically split case pump(s), Size ______ single stage horizontal split case design withcast iron casing, bronze impeller, regreasable ball bearings and mechanical seals. The pump(s) shall bebase mounted and flex-coupled complete with coupling and steel coupling guard. Pump(s) shall notoverload at any point on its capacity head curve with the use of available service factor.Pump No. 1 shall be Model ________, ________GPM at _____TDH, _____HPPump No. 2 shall be Model ________, ________GPM at _____TDH, _____HPPump No. 3 shall be Model ________, ________GPM at _____TDH, _____HPMotor(s)Motor(s) shall be horizontal. T-frame, high efficiency, open drip-proof, copper wound, NEMA design Bwith a 1.15 service factor.____RPM ____% Min. Eff., ____% Power Factor, ____ Volt, ____ Phase, ____ Hertz.SPECIFICATION NO. 6100.2May 2006PAGE 24034 Mint Way, Dallas, TX 75237 • (800) 783-6756 • Tel: (214) 337-8780 • Fax: (214) 333-2742E-Mail: sales@tigerflow.comVALVESIsolation Valves: Individual pump suction and discharge valves shall be provided with (Lug StyleButterfly Valve(s) with Lever handle(s)) (Full Port Ball Valve(s))Control Valves: Provide a combination pressure regulating and non-slam check valve on the discharge ofeach pump. (Provide a non-slam check valve on the discharge of each pump).OVER-TEMPERATURE PROTECTIONEach pump shall be equipped with an individual combination type non-electric temperature probe andpurge assembly.U.L. LISTED POWER AND CONTROL PANEL(1)U.L. Listed, NEMA 4, Tiger's Eye Mark II Solid State, Power and Control Panel(*)U.L./C-U.L. 508 Label(*)Micro Controller:-FLASH Main Memory-EEPROM Memory For All User Set points-Multi Level Security(*)Panel Face Mounted 4-Line Operator Interface with 20 Button Touch PadFunctions Included:-Pressure Sequencing with Read Out in PSI-Suction and Discharge Pressure Read Out in PSI-Individual Pump Run Indication-H-O-A Selectors-ETM's-Low Suction Alarm with TDR-Low System with TDR-High Suction Shutdown and TDR-High System Alarm with TDR-Automatic Alternation of Equal Sized Pumps( )Thru Door Disconnect(s) with Individual Motor Circuit Protection( )FVNR Magnetic Starters with 3-Leg Overload Protection(* ) 12 Volt U.L./C-U.L., CE Approved Switching Power Supply. Unit Must Have Built-In Breaker Bar with Over Demand Protection(*) 120 Volt Fused Control Circuit Transformer(1)Power on Light(1)Individual Aux Alarm Contacts(2)Panel Mounted stainless steel Pressure Transducers (1) Suction (1) DischargeSPECIFICATION NO. 6100.2May 2006PAGE 34034 Mint Way, Dallas, TX 75237 • (800) 783-6756 • Tel: (214) 337-8780 • Fax: (214) 333-2742E-Mail: sales@tigerflow.comLAG PUMP SEQUENCINGEach lag pump shall be sequenced by: (Pressure sequencing with programmable minimum run timers andtime delay relays). (Insertion type paddle wheel flow sensor complete with digital flow indication inGPM through operator interface). NOTE: Pressure switches in lieu of pressure transducers will not beallowed.HYDRO-PNEUMATIC TANKProvide a Section VIII, ASME CODE, National Board stamped, Hydro-Pneumatic tank. Tank shall beprovided complete with a FDA approved replaceable bladder, bottom connection, air fill valve, andgauge. Tank shall be (Model TF132, 132 Gal., 125 PSI) (MODEL TF 185, 185 Gal., 200 PSI).FACTORY PREFABRICATIONProvide each system as a complete package system on a structural steel mounting frame, piped, tubed,mounted and wired. Unit shall be factory primed and painted with machine grade finish coat. All weldingshall be performed by ASME Section 9 certified welders.Suction and discharge headers shall be: (Stainless steel) (Galvanized Steel), (Type “L” Copper).Note: (1) System manufacturer shall isolate all ferrous from all non-ferrous materials.THIRD PARTY TESTING, OSHA REQUIREMENTThe package shall be UL Listed as a system for its intended use, so meeting OSHA Federal Regulations29 CFR 1910.303 and 399 as well as NFPA Pamphlet #70 (National Electric Code) Article 90-7, City ofLos Angeles Approval Code, CMR248 Massachusetts State Plumbing Code Approval.FACTORY TESTThe package shall be electrically and hydrostatically tested before shipment, in addition, each systemshall be factory tested from 0-100% of flow and pressure. (Provide certified x-y test report.)STARTUPThe factory authorized local representative shall provide (2) hours of startup and field training.WARRANTYEach TIGERFLOW system shall be warranted for a period of (18) months from date of shipment or (12)months from date of startup, whichever occurs first.SUBMITTALS & INSURANCE CERTIFICATIONSSubmittals shall be in accordance with requirements of general specifications. Submit 6 copies to theengineer for approval. All submittals must include the following:SPECIFICATION NO. 6100.2May 2006PAGE 44034 Mint Way, Dallas, TX 75237 • (800) 783-6756 • Tel: (214) 337-8780 • Fax: (214) 333-2742E-Mail: sales@tigerflow.com• Complete shop drawings and complete wiring diagrams. All drawings must be AUTOCADDRelease 14; complete with full mechanical Desk Top 3-D drawings in both hardcopy and diskformat. Complete operating and maintenance instructions.• Furnish written certification of the manufacturers listing with Underwriters Laboratories as anapproved manufacturer of control panels.• Furnish written certification that the manufacturer is listed by UL/C-UL as an approvedmanufacturer of factory assembled pumping systems.• A complete, easily readable functional description of the proposed equipment.• Upon completion of the installation, the results of the field and acceptance tests as specifiedunder this section of the specification shall be submitted to the engineer.• Furnished written certification from the manufacturers representative of the properinstallation of the station.• Provide written certification that, a nationally recognized manufacturer of package pumpsystems, manufactures the pump system. A corporate officer must sign this certification.• Operation and maintenance manuals:Submit complete operations and maintenance information for this specific equipment. Theengineer shall review these manuals for completeness. They shall include complete parts listincluding manufacturers reference and ordering number, the local representative name,address and phone number, the model and serial number of the system.• The manufacturers shall submit a certificate of product liability insurance for no less than onemillion dollars ($1,000,000)QUALITY ASSURANCE• All equipment under this section shall be furnished by a single supplier and shall be productsthat the manufacturer regularly engages in. The supplier shall have sole responsibility forproper functioning of the system and equipment supplied.• Equipment shall be a manufacturer’s standard product presently in commercial production.• The manufacturer shall have in place a quality assurance program to assure the quality of thematerial furnished.QUALIFICATIONS• The manufacturer shall have a minimum of ten years manufacturing and applicationexperience.• Upon request from the engineer, the pump station manufacturer shall demonstrate proof offinancial responsibility with respect to performance and delivery date.• Upon request from the engineer, the pump station manufacturer shall provide proof orevidence of facilities, equipment and skills required to produce the equipment specifiedherein.SPEC ES-3000-FC-VFDMay 2006Page #44034 Mint Way, Dallas, TX 75237 • (800) 783-6756 • Tel: (214) 337-8780 • Fax: (214) 333-2742E-Mail: sales@tigerflow.comVARIABLE SPEED DRIVESProvide two (2), AC Tech Sub Micro, 460/3/60 U.L./C-U.L. listed, IBGT PWM, variable speeddrives with-U.L./C-U.L label-VFD start/stop-Speed reference-Fault diagnostics-Meter points:Motor power in HPMotor power in KWMotor KW-HRMotor currentMotor voltageHours runFeedback signal 1 & 2DC link voltageThermal load on motorThermal load on VFDHeat sink temperatureREMOTE DIFFERENTIAL PRESSURE TRANSMITTERSProvide one (1) Siemens Sitran or Rosemont 1151-DP differential pressure transmitters forremote mounting by EMS contractor.-Each transmitter shall be pre-calibrated for the design range-Minimum accuracy of +/- 0.25% of calibrated span-2000 PSI over pressure-All welded parts to be stainless steel with housing clearly marked with high pressureand low pressure parts.-Units shall be housed in waterproof enclosure with NPT female pipe ports and NPTconduit port.-4.20MAFACTORY PREFABRICATIONProvide each system as a complete package system on a structural steel mounting frame,piped, tubed, mounted and wired. Unit shall be factory primed and painted with machinegrade finish coat. All welding shall be performed by ASME Section 9 certified welders. Systemshall be (Horizontal) construction.Suction, discharge headers and flowsensor loop shall be: 6” (Schedule 40 Black Steel withClass 150 Flanges).SPEC ES-3000-FC-VFDMay 2006Page #54034 Mint Way, Dallas, TX 75237 • (800) 783-6756 • Tel: (214) 337-8780 • Fax: (214) 333-2742E-Mail: sales@tigerflow.comTHIRD PARTY REQUIREMENTSThe package shall be UL Listed as a system for its intended use, so meeting OSHA FederalRegulations 29 CFR 1910.303 and 399 as well as NFPA Pamphlet #70 (National ElectricCode) Article 90-7, City of Los Angeles Approval Code, CMR248 Massachusetts StatePlumbing Code Approval.FACTORY TESTThe package shall be electrically, hydrostatically and run tested before shipment, with an x-ytest report. All flow meters, flows sensors, pressure gauges, electrical instrumentation andelectrical meters are all independently calibrated and all traceable to NIST.STARTUPThe factory authorized local representative shall provide startup and acceptance testing inaccordance with requirements.WARRANTYEach TIGERFLOW system shall be warranted for a period of (18) months from date ofshipment or (12) months from date of startup, whichever occurs first.SUBMITTALS & INSURANCE CERTIFICATIONSSubmittals shall be in accordance with requirements of general specifications. Submit 6copies to the engineer for approval. All submittals must include the following:• Complete shop drawings and complete wiring diagrams. All drawings must beAUTOCADD Release 2000; complete with full mechanical Desk Top 3-D drawingsin both hardcopy and disk format. Complete operating and maintenanceinstructions.• Furnish written certification of the manufacturers listing with UnderwritersLaboratories as an approved manufacturer of control panels.• Furnish written certification that the manufacturer is listed by UL/C-UL as anapproved manufacturer of factory assembled pumping systems.• A complete, easily readable functional description of the proposed equipment.• Upon completion of the installation, the results of the field and acceptance tests asspecified under this section of the specification shall be submitted to the engineer.• Furnished written certification from the manufacturers representative of the properinstallation of the station.• Provide written certification that, a nationally recognized manufacturer of packagepump systems, manufactures the pump system. A corporate officer must sign thiscertification.SPEC ES-3000-FC-VFDMay 2006Page #64034 Mint Way, Dallas, TX 75237 • (800) 783-6756 • Tel: (214) 337-8780 • Fax: (214) 333-2742E-Mail: sales@tigerflow.com• Operation and maintenance manuals:Submit complete operations and maintenance information for this specificequipment. The engineer shall review these manuals for completeness. They shallinclude complete parts list including manufacturers reference and ordering number,the local representative name, address and phone number, the model and serialnumber of the system.• The manufacturers shall submit a certificate of product liability insurance for no lessthan one million dollars ($1,000,000)QUALITY ASSURANCE• All equipment under this section shall be furnished by a single supplier and shall beproducts that the manufacturer regularly engages in. The supplier shall have soleresponsibility for proper functioning of the system and equipment supplied.• Equipment shall be a manufacturer’s standard product presently in commercialproduction.• The manufacturer shall have in place a quality assurance program to assure thequality of the material furnished.QUALIFICATIONS• The manufacturer shall have a minimum of ten years manufacturing and applicationexperience.• Upon request from the engineer, the pump station manufacturer shall demonstrateproof of financial responsibility with respect to performance and delivery date.• Upon request from the engineer, the pump station manufacturer shall provide proofor evidence of facilities, equipment and skills required to produce the equipmentspecified herein.OUTLINEDRAWING #THIRD ANGLE PROJECTION SCALENTS HVAC-01 --REVPRODUCTION #PROJECT NAMENAMETHIS DOCUMENT CONTAINS INFORMATION THAT IS CONFIDENTIAL AND PROPRIETARY TO TIGERFLOW SYSTEMS, INC. ("TIGERFLOW"). THIS DOCUMENT IS FURNISHED WITH THE UNDERSTANDING THAT THE DOCUMENT AND THE INFORMATION IT CONTAINS WILL NOT BE COPIED OR DISCLOSED TO OTHERS EXCEPT WITH THE WRITTEN CONSENT OF TIGERFLOW, WILL NOT BE USED EXCEPT FOR THE BENEFIT OF TIGERFLOW AND WILL BE RETURNED AND ALL FURTHER USE DISCONTINUED UPON REQUEST FROM TIGERFLOW.SUBMITTAL DRAWING-ALL DIMENSIONS ARE REFERENCE ONLY AND SUBJECT TO CHANGE; DO NOT USE FOR CONSTRUCTION PURPOSE UNLESS CERTIFIED-DO NOT SCALE DRAWINGASYSTEM CONNECTIONSLLENGTHWWIDTHHHEIGHTNOTES: 1. FINISH: GREY, ENAMEL PAINT2. CONDITION POINT: ________GPM @ _______' TDH 3. PIPE SUPPORTS NOT SHOWN FOR CLARITY.4. SYSTEM SHOWN REPRESENTS TYPICAL GEOMETRY ONLY; DRAWINGS SPECIFIC ANT GIVEN PROJECT WILL BE SUPPLIED AT TIME OF RELEASE FOR MANUFACTURE.ACLASS 150SUCTIONCONNECTIONACLASS 150DISCHARGECONECTION1 2 PUMP, END SUCTION, FRAME MOUNTED2 1 GAGE BOARD3 2 VALVE, SUCTION DIFFUSER4 1 CONTROL PANEL5 1 ASSEMBLY, SKID6 2 VALVE, BUTTERFLY7 2 VALVE, TRIPLE DUTYSYM QTY PARTParts List4213675OUTLINEDRAWING #THIRD ANGLE PROJECTION SCALENTS HVAC-02 --REVPRODUCTION #PROJECT NAMENAMETHIS DOCUMENT CONTAINS INFORMATION THAT IS CONFIDENTIAL AND PROPRIETARY TO TIGERFLOW SYSTEMS, INC. ("TIGERFLOW"). THIS DOCUMENT IS FURNISHED WITH THE UNDERSTANDING THAT THE DOCUMENT AND THE INFORMATION IT CONTAINS WILL NOT BE COPIED OR DISCLOSED TO OTHERS EXCEPT WITH THE WRITTEN CONSENT OF TIGERFLOW, WILL NOT BE USED EXCEPT FOR THE BENEFIT OF TIGERFLOW AND WILL BE RETURNED AND ALL FURTHER USE DISCONTINUED UPON REQUEST FROM TIGERFLOW.SUBMITTAL DRAWING-ALL DIMENSIONS ARE REFERENCE ONLY AND SUBJECT TO CHANGE; DO NOT USE FOR CONSTRUCTION PURPOSE UNLESS CERTIFIED-DO NOT SCALE DRAWINGASYSTEM CONNECTIONSLLENGTHWWIDTHHHEIGHTNOTES: 1. FINISH: GREY, ENAMEL PAINT2. CONDITION POINT: ________GPM @ _______' TDH 3. PIPE SUPPORTS NOT SHOWN FOR CLARITY.4. SYSTEM SHOWN REPRESENTS TYPICAL GEOMETRY ONLY; DRAWINGS SPECIFIC ANT GIVEN PROJECT WILL BE SUPPLIED AT TIME OF RELEASE FOR MANUFACTURE.ACLASS 150SUCTIONCONNECTION1 2 PUMP, END SUCTION, FRAME MOUNTED2 1 GAGE BOARD3 2 SUCTION DIFFUSER4 1 CONTROL PANEL5 1 ASSEMBLY, BYPASS6 1 ASSEMBLY, SKID7 6 VALVE, BUTTERFLY8 2 VALVE, TRIPLE DUTYSYM QTY PARTParts List41376ACLASS 125/150DISCHARGE CONNECTIONCHILLER 1ACLASS 125/150DISCHARGE CONNECTIONCHILLER 25278OUTLINEDRAWING #THIRD ANGLE PROJECTION SCALENTS HVAC-03 --REVPRODUCTION #PROJECT NAMENAMETHIS DOCUMENT CONTAINS INFORMATION THAT IS CONFIDENTIAL AND PROPRIETARY TO TIGERFLOW SYSTEMS, INC. ("TIGERFLOW"). THIS DOCUMENT IS FURNISHED WITH THE UNDERSTANDING THAT THE DOCUMENT AND THE INFORMATION IT CONTAINS WILL NOT BE COPIED OR DISCLOSED TO OTHERS EXCEPT WITH THE WRITTEN CONSENT OF TIGERFLOW, WILL NOT BE USED EXCEPT FOR THE BENEFIT OF TIGERFLOW AND WILL BE RETURNED AND ALL FURTHER USE DISCONTINUED UPON REQUEST FROM TIGERFLOW.SUBMITTAL DRAWING-ALL DIMENSIONS ARE REFERENCE ONLY AND SUBJECT TO CHANGE; DO NOT USE FOR CONSTRUCTION PURPOSE UNLESS CERTIFIED-DO NOT SCALE DRAWINGASYSTEM CONNECTIONSLLENGTHWWIDTHHHEIGHTNOTES: 1. FINISH: GREY, ENAMEL PAINT2. CONDITION POINT: ________GPM @ _______' TDH 3. PIPE SUPPORTS NOT SHOWN FOR CLARITY.4. SYSTEM SHOWN REPRESENTS TYPICAL GEOMETRY ONLY; DRAWINGS SPECIFIC ANT GIVEN PROJECT WILL BE SUPPLIED AT TIME OF RELEASE FOR MANUFACTURE.ACLASS 150SUCTIONCONNECTION1 3 PUMP, END SUCTION, FRAME MOUNTED2 1 GAGE BOARD3 3 SUCTION DIFFUSER4 1 CONTROL PANEL6 1 ASSEMBLY, SKID7 3 VALVE, BUTTERFLY8 3 VALVE, TRIPLE DUTYSYM QTY PARTParts List4376ACLASS 150DISCHARGE CONNECTION281OUTLINEDRAWING #THIRD ANGLE PROJECTION SCALENTS HVAC-04 --REVPRODUCTION #PROJECT NAMENAMETHIS DOCUMENT CONTAINS INFORMATION THAT IS CONFIDENTIAL AND PROPRIETARY TO TIGERFLOW SYSTEMS, INC. ("TIGERFLOW"). THIS DOCUMENT IS FURNISHED WITH THE UNDERSTANDING THAT THE DOCUMENT AND THE INFORMATION IT CONTAINS WILL NOT BE COPIED OR DISCLOSED TO OTHERS EXCEPT WITH THE WRITTEN CONSENT OF TIGERFLOW, WILL NOT BE USED EXCEPT FOR THE BENEFIT OF TIGERFLOW AND WILL BE RETURNED AND ALL FURTHER USE DISCONTINUED UPON REQUEST FROM TIGERFLOW.SUBMITTAL DRAWING-ALL DIMENSIONS ARE REFERENCE ONLY AND SUBJECT TO CHANGE; DO NOT USE FOR CONSTRUCTION PURPOSE UNLESS CERTIFIED-DO NOT SCALE DRAWINGASYSTEM CONNECTIONSLLENGTHWWIDTHHHEIGHTNOTES: 1. FINISH: GREY, ENAMEL PAINT2. CONDITION POINT: ________GPM @ _______' TDH 3. PIPE SUPPORTS NOT SHOWN FOR CLARITY.4. SYSTEM SHOWN REPRESENTS TYPICAL GEOMETRY ONLY; DRAWINGS SPECIFIC ANT GIVEN PROJECT WILL BE SUPPLIED AT TIME OF RELEASE FOR MANUFACTURE.ACLASS 150SUCTIONCONNECTION1 3 PUMP, END SUCTION, FRAME MOUNTED2 1 GAGE BOARD3 3 SUCTION DIFFUSER4 1 CONTROL PANEL5 1 ASSEMBLY, BYPASS6 1 ASSEMBLY, SKID7 9 VALVE, BUTTERFLY8 3 VALVE, TRIPLE DUTY11 1 ASSEMBLY, SPOOL 3"12 1 ASSEMBLY, SPOOL, 2-1/2"9 1 ASSEMBLY, REDUCERSYM QTY PARTParts List4376ACLASS 125/150DISCHARGE CONNECTIONCHILLER 2ACLASS 125/150DISCHARGE CONNECTIONCHILLER 3(OPTIONAL)2781ACLASS 125/150DISCHARGE CONNECTIONCHILLER 15THIRD ANGLE PROJECTIONTHIS DOCUMENT CONTAINS INFORMATION THAT IS CONFIDENTIAL AND PROPRIETARY TO TIGERFLOW SYSTEMS, INC. ("TIGERFLOW"). THIS DOCUMENT IS FURNISHED WITH THE UNDERSTANDING THAT THE DOCUMENT AND THE INFORMATION IT CONTAINS WILL NOT BE COPIED OR DISCLOSED TO OTHERS EXCEPT WITH THE WRITTEN CONSENT OF TIGERFLOW, WILL NOT BE USED EXCEPT FOR THE BENEFIT OF TIGERFLOW AND WILL BE RETURNED AND ALL FURTHER USE DISCONTINUED UPON REQUEST FROM TIGERFLOW.HVAC-05DRAWING #PRODUCTION #PROJECT NAME-ALL DIMENSIONS ARE REFERENCE ONLY AND SUBJECT TO CHANGE; DO NOT USE FOR CONSTRUCTION PURPOSE UNLESS CERTIFIED-DO NOT SCALE DRAWINGNTSSCALESUBMITTAL DRAWINGNAME--REVOUTLINEWWIDTHASYSTEM CONNECTIONSLLENGTHHHEIGHTNOTES: 1. FINISH: GREY, ENAMEL PAINT2. CONDITION POINT: ________GPM @ _______' TDH 3. PIPE SUPPORTS NOT SHOWN FOR CLARITY.4. SYSTEM SHOWN REPRESENTS TYPICAL GEOMETRY ONLY; DRAWINGS SPECIFIC ANT GIVEN PROJECT WILL BE SUPPLIED AT TIME OF RELEASE FOR MANUFACTURE.1 2 PUMP, END SUCTION, FRAME MOUNTED2 1 AIR SEPERATOR3 2 FLEX CONNECTOR4 4 ISOLATION SPRING5 2 SUCTION DIFFUSER6 1 TANK, EXPANSION7 1 CONTROL PANEL, MARK SERIES8 2 CONTROL PANEL, VFD9 1 ASSEMBLY, GAGE BOARD10 1 ASSEMBLY, HEADER, DISCHARGE11 1 ASSEMBLY, HEADER, SUCTION12 1 ASSEMBLY, WATER MAKE-UP LINE13 1 VALVE, AIR VENT14 3 VALVE, BALL, NPT, 3/4"15 4 VALVE, BUTTERFLY LUG-STYLE16 2 VALVE, CHECK, NON SLAMSYM QTY PARTParts ListL WH3313126871015416152A CLASS 150FLANGESUCTIONCONNECTIONA CLASS 150FLANGEDISCHARGECONNECTION113/4" FNPTWATER MAKE-UPCONNECTION914LLENGTHNTS-ALL DIMENSIONS ARE REFERENCE ONLY AND SUBJECT TO CHANGE; DO NOT USE FOR CONSTRUCTION PURPOSE UNLESS CERTIFIED-DO NOT SCALE DRAWINGTHIS DOCUMENT CONTAINS INFORMATION THAT IS CONFIDENTIAL AND PROPRIETARY TO TIGERFLOW SYSTEMS, INC. ("TIGERFLOW"). THIS DOCUMENT IS FURNISHED WITH THE UNDERSTANDING THAT THE DOCUMENT AND THE INFORMATION IT CONTAINS WILL NOT BE COPIED OR DISCLOSED TO OTHERS EXCEPT WITH THE WRITTEN CONSENT OF TIGERFLOW, WILL NOT BE USED EXCEPT FOR THE BENEFIT OF TIGERFLOW AND WILL BE RETURNED AND ALL FURTHER USE DISCONTINUED UPON REQUEST FROM TIGERFLOW.SUBMITTAL DRAWINGTHIRD ANGLE PROJECTION SCALEASYSTEM CONNECTIONSOUTLINEHVAC-06NAMEPROJECT NAMEDRAWING #PRODUCTION #REV--WWIDTHHHEIGHTNOTES: 1. FINISH: GREY, ENAMEL PAINT.2. CONDITION POINT: ________GPM @ _______' TDH 3. PIPE SUPPORTS NOT SHOWN FOR CLARITY.4. SYSTEM SHOWN REPRESENTS TYPICAL GEOMETRY ONLY; DRAWINGS SPECIFIC ANT GIVEN PROJECT WILL BE SUPPLIED AT TIME OF RELEASE FOR MANUFACTURE.LWHA" CLASS 150FLANGESUCTIONCONNECTIONA" CLASS 150FLANGEDISCHARGECONNECTION51121110 97461 3 PUMP, HORIZONYAL SPLIT-CASE2 1 ASSEMBLY, INERTIA BASE3 2 FLEX CONNECTOR4 6 ISOLATION SPRING5 3 SUCTION DIFFUSER6 1 CONTROL PANEL, TIGER'S EYE MARK SERIES7 3 VARIABLE FREQUENCY DRIV8 1 ASSEMBLY, GAGE BOARD9 1 ASSEMBLY, HEADER, DISCHARGE10 1 ASSEMBLY, HEADER, SUCTION11 6 VALVE, BUTTERFLY W/ GEAR OPERATOR12 3 VALVE, CHECK, NON-SLAMSYM QTY PARTParts List23877-ALL DIMENSIONS ARE REFERENCE ONLY AND SUBJECT TO CHANGE; DO NOT USE FOR CONSTRUCTION PURPOSE UNLESS CERTIFIED-DO NOT SCALE DRAWINGNTSSUBMITTAL DRAWINGTHIRD ANGLE PROJECTION SCALEHVAC-07OUTLINEDRAWING #PROJECT NAMENAME--REVPRODUCTION #NOTES: 1. FINISH: GREY, ENAMEL PAINT2. CONDITION POINT: ________GPM @ _______' TDH 3. PIPE SUPPORTS NOT SHOWN FOR CLARITY.4. SYSTEM SHOWN REPRESENTS TYPICAL GEOMETRY ONLY; DRAWINGS SPECIFIC ANT GIVEN PROJECT WILL BE SUPPLIED AT TIME OF RELEASE FOR MANUFACTURE.THIS DOCUMENT CONTAINS INFORMATION THAT IS CONFIDENTIAL AND PROPRIETARY TO TIGERFLOW SYSTEMS, INC. ("TIGERFLOW"). THIS DOCUMENT IS FURNISHED WITH THE UNDERSTANDING THAT THE DOCUMENT AND THE INFORMATION IT CONTAINS WILL NOT BE COPIED OR DISCLOSED TO OTHERS EXCEPT WITH THE WRITTEN CONSENT OF TIGERFLOW, WILL NOT BE USED EXCEPT FOR THE BENEFIT OF TIGERFLOW AND WILL BE RETURNED AND ALL FURTHER USE DISCONTINUED UPON REQUEST FROM TIGERFLOW.(480 [40'])(78 [6'-6"])(102 [8'-6"])CONDENSOR WATER SYSTEMPRIMARY CHILL WATERSYSTEMSECONDARYCHILL WATER SYSTEMBRIDGE(65 [5'-5"])THIS DOCUMENT CONTAINS INFORMATION THAT IS CONFIDENTIAL AND PROPRIETARY TO TIGERFLOW SYSTEMS, INC. ("TIGERFLOW"). THIS DOCUMENT IS FURNISHED WITH THE UNDERSTANDING THAT THE DOCUMENT AND THE INFORMATION IT CONTAINS WILL NOT BE COPIED OR DISCLOSED TO OTHERS EXCEPT WITH THE WRITTEN CONSENT OF TIGERFLOW, WILL NOT BE USED EXCEPT FOR THE BENEFIT OF TIGERFLOW AND WILL BE RETURNED AND ALL FURTHER USE DISCONTINUED UPON REQUEST FROM TIGERFLOW.NOTES: 1. FINISH: GREY, ENAMEL PAINT2. CONDITION POINT: 590 GPM @ 60' TDH (EACH PRIMARY PUMP) 590 GPM @ 150' TDH (EACH SECONDARY PUMP)3. PIPE SUPPORTS NOT SHOWN FOR CLARITY.4. SYSTEM SHOWN REPRESENTS TYPICAL GEOMETRY ONLY; DRAWINGS SPECIFIC ANT GIVEN PROJECT WILL BE SUPPLIED AT TIME OF RELEASE FOR MANUFACTURE..PHONE: (800) 783-6756 FAX: (214) 333-2742 E-MAIL: engineering@tigerflow.comWEB SITE: www.tigerflow.comPRODUCTION #NAMEPROJECT NAMEDRAWING #THIRD ANGLE PROJECTION-ALL DIMENSIONS ARE REFERENCE ONLY AND SUBJECT TO CHANGE; DO NOT USE FOR CONSTRUCTION PURPOSE UNLESS CERTIFIED-DO NOT SCALE DRAWINGSCALENTSSUBMITTAL DRAWINGOUTLINEHVAC-08REV--(88 [7'-4"])BUILDING RETURNFROM CHIILERSTO BUILDING(380 [31'-8"])(80 [6'-8"])(190) (190 [15'-10"])TO CHILLERS-ALL DIMENSIONS ARE REFERENCE ONLY AND SUBJECT TO CHANGE; DO NOT USE FOR CONSTRUCTION PURPOSE UNLESS CERTIFIED-DO NOT SCALE DRAWINGTHIS DOCUMENT CONTAINS INFORMATION THAT IS CONFIDENTIAL AND PROPRIETARY TO TIGERFLOW SYSTEMS, INC. ("TIGERFLOW"). THIS DOCUMENT IS FURNISHED WITH THE UNDERSTANDING THAT THE DOCUMENT AND THE INFORMATION IT CONTAINS WILL NOT BE COPIED OR DISCLOSED TO OTHERS EXCEPT WITH THE WRITTEN CONSENT OF TIGERFLOW, WILL NOT BE USED EXCEPT FOR THE BENEFIT OF TIGERFLOW AND WILL BE RETURNED AND ALL FURTHER USE DISCONTINUED UPON REQUEST FROM TIGERFLOW.PHONE: (800) 783-6756 FAX: (214) 333-2742 E-MAIL: engineering@tigerflow.comWEB SITE: www.tigerflow.comHVAC-08THIRD ANGLE PROJECTIONNTSSCALEDRAWING #SUBMITTAL DRAWINGPROJECT NAMEPRODUCTION #NAMEOUTLINE--REVLLENGTHNTS-ALL DIMENSIONS ARE REFERENCE ONLY AND SUBJECT TO CHANGE; DO NOT USE FOR CONSTRUCTION PURPOSE UNLESS CERTIFIED-DO NOT SCALE DRAWINGTHIS DOCUMENT CONTAINS INFORMATION THAT IS CONFIDENTIAL AND PROPRIETARY TO TIGERFLOW SYSTEMS, INC. ("TIGERFLOW"). THIS DOCUMENT IS FURNISHED WITH THE UNDERSTANDING THAT THE DOCUMENT AND THE INFORMATION IT CONTAINS WILL NOT BE COPIED OR DISCLOSED TO OTHERS EXCEPT WITH THE WRITTEN CONSENT OF TIGERFLOW, WILL NOT BE USED EXCEPT FOR THE BENEFIT OF TIGERFLOW AND WILL BE RETURNED AND ALL FURTHER USE DISCONTINUED UPON REQUEST FROM TIGERFLOW.SUBMITTAL DRAWINGTHIRD ANGLE PROJECTION SCALEASYSTEM CONNECTIONSOUTLINEHVAC-09NAMEPROJECT NAMEDRAWING #PRODUCTION #REV--WWIDTHHHEIGHTNOTES: 1. FINISH: GREY, ENAMEL PAINT2. CONDITION POINT: ________GPM @ _______' TDH 3. PIPE SUPPORTS NOT SHOWN FOR CLARITY.4. SYSTEM SHOWN REPRESENTS TYPICAL GEOMETRY ONLY; DRAWINGS SPECIFIC ANT GIVEN PROJECT WILL BE SUPPLIED AT TIME OF RELEASE FOR MANUFACTURE.1 2 PUMP, FRAME MOUNTED END SUCTION2 1 ENVIORMENTAL ENCLOSURE3 1 FAN, SHUTTERED4 2 FLEX CONNECTOR5 1 GAGE BOARD6 1 GFCI7 4 ISOLATION SPRING8 2 LIGHT, FLOURESCENT9 1 LOUVRE10 2 SUCTION DIFFUSER11 1 CONTROL PANEL12 1 MINI-POWER ZONE13 1 ASSEMBLY, HEADER, DISCHARGE14 1 ASSEMBLY, HEADER, SUCTION15 1 ASSEMBLY, INERTIA BASE16 1 ASSEMBLY, SKID17 2 VALVE, BUTTERFLY, LUG STYLE18 2 VALVE, TRIPLE DUTY, ANGLE PATTERNSYM QTY PARTParts List1283918117161571314511104A" CLASS150VIC FLANGESUCTION CONNECTIONA" CLASS150VIC FLANGEDISCHARGECONNECTIONDIAMOND PLATE FLOORNOTES: 1. FINISH: GREY ENAMEL PAINT.2. CONDITION POINT: ______GPM _____ 'TDH.3. SYSTEM SHOWN REPRESENTS TYPICAL GEOMETRY ONLY; DRAWINGS SPECIFIC TO GIVEN PROJECT WILL BE SUPPLIED AT TIME OF RELEASE FOR MANUFACTURE.OUTLINEDRAWING #THIRD ANGLE PROJECTION SCALENTS HVAC-10 --REVPRODUCTION #PROJECT NAMENAMETHIS DOCUMENT CONTAINS INFORMATION THAT IS CONFIDENTIAL AND PROPRIETARY TO TIGERFLOW SYSTEMS, INC. ("TIGERFLOW"). THIS DOCUMENT IS FURNISHED WITH THE UNDERSTANDING THAT THE DOCUMENT AND THE INFORMATION IT CONTAINS WILL NOT BE COPIED OR DISCLOSED TO OTHERS EXCEPT WITH THE WRITTEN CONSENT OF TIGERFLOW, WILL NOT BE USED EXCEPT FOR THE BENEFIT OF TIGERFLOW AND WILL BE RETURNED AND ALL FURTHER USE DISCONTINUED UPON REQUEST FROM TIGERFLOW.SUBMITTAL DRAWING-ALL DIMENSIONS ARE REFERENCE ONLY AND SUBJECT TO CHANGE; DO NOT USE FOR CONSTRUCTION PURPOSE UNLESS CERTIFIED-DO NOT SCALE DRAWINGASYSTEM CONNECTIONSLLENGTHWWIDTHHHEIGHTA" CLASS 150FLANGESUCTIONCONNECTIONA" CLASS 150FLANGEDISCHARGECONNECTIONDIAMOND PLATEDECK20232011246161042212172211581 3 PUMP, FLEX COUPLED, AND SUCTION2 1 AIR SEPERATOR3 1 ENVIORMENTAL ENCLOSURE4 1 FAN, SHUTTERED5 2 FLEX CONNECTOR6 2 FLUORESCENT LIGHT FIXTURE 7 1 GAGE BOARD8 1 GFCI9 4 ISOLATION SPRING10 1 LIGHT SWITCH11 1 SHUTTER12 1 TANK, EXPANSION13 3 SUCTION DIFFUSER14 1 CONTROL PANEL15 1 MINI-POWER ZONE16 1 THERMOSTAT17 1 ASSEMBLY, CHEMICAL SHOT FEEDER LINE18 1 ASSEMBLY, HEADER, DISCHARGE19 1 ASSEMBLY, HEADER, SUCTION20 1 ASSEMBLY, INERTIA BASE21 1 ASSEMBLY, SKID22 1 VALVE, AIR VENT23 4 VALVE, BUTTERFLY, LUG STYLE24 3 VALVE, TRIPLE DUTY, ANGLE PATTERNSYM QTY PARTParts List19187516PRODUCTION #THIS DOCUMENT CONTAINS INFORMATION THAT IS CONFIDENTIAL AND PROPRIETARY TO TIGERFLOW SYSTEMS, INC. ("TIGERFLOW"). THIS DOCUMENT IS FURNISHED WITH THE UNDERSTANDING THAT THE DOCUMENT AND THE INFORMATION IT CONTAINS WILL NOT BE COPIED OR DISCLOSED TO OTHERS EXCEPT WITH THE WRITTEN CONSENT OF TIGERFLOW, WILL NOT BE USED EXCEPT FOR THE BENEFIT OF TIGERFLOW AND WILL BE RETURNED AND ALL FURTHER USE DISCONTINUED UPON REQUEST FROM TIGERFLOW.THIRD ANGLE PROJECTION-ALL DIMENSIONS ARE REFERENCE ONLY AND SUBJECT TO CHANGE; DO NOT USE FOR CONSTRUCTION PURPOSE UNLESS CERTIFIED-DO NOT SCALE DRAWINGSCALENTSDRAWING #NAMESUBMITTAL DRAWINGHVAC-11OUTLINE--REV61911H18294138171214ASYSTEM CONNECTIONSLLENGTHWWIDTHHHEIGHTNOTES: 1. FINISH: GREY, ENAMEL PAINT (SKID / INTERIOR PIPING) SAND TAN (EXTERIOR PANELS).2. CONDITION POINT: ________GPM @ _______' TDH 3. PIPE SUPPORTS NOT SHOWN FOR CLARITY.4. SYSTEM SHOWN REPRESENTS TYPICAL GEOMETRY ONLY; DRAWINGS SPECIFIC ANT GIVEN PROJECT WILL BE SUPPLIED AT TIME OF RELEASE FOR MANUFACTURE.1 2 PUMP, VERTICAL INLINE2 1 AIR SEPERATOR3 1 ENVIORMENTAL ENCLOSURE4 1 FAN, SHUTTERED5 2 FLEX CONNECTOR, STAINLESS STEEL CORRUGATED HOSE W/ WOVEN BRAID6 1 FLUORESCENT LIGHT FIXTURE 7 1 GFCI8 4 ISOLATION SPRING9 1 SHUTTER10 2 SUCTION DIFFUSER11 1 TANK, EXPANSION12 1 CONTROL PANEL13 1 MINI-POWER ZONE14 1 ASSEMBLY, CHEMICAL SHOT FEEDER LINE15 1 ASSEMBLY, GAGE BOARD16 2 ASSEMBLY, HEADER17 1 ASSEMBLY, INERTIA BASE18 1 ASSEMBLY, SKID19 1 VALVE, AIR VENT20 2 VALVE, BALL21 2 VALVE, BUTTERFLY22 2 VALVE, TRIPLE DUTY, ANGLE PATTERNSYM QTY PARTParts ListA" CLASS 150VIC FLANGESUCTION CONNECTIONA" CLASS 150VIC FLANGEDISCHARGECONNECTION102213/4" FNPTWATER MAKE-UP CONNECTIONDIAMOND PLATEDECK(OPTIONAL)4551678631" NPT DISCHARGEFLOATSWITCH(26) (30)2(72)NTS-ALL DIMENSIONS ARE REFERENCE ONLY AND SUBJECT TO CHANGE; DO NOT USE FOR CONSTRUCTION PURPOSE UNLESS CERTIFIED-DO NOT SCALE DRAWINGTHIS DOCUMENT CONTAINS INFORMATION THAT IS CONFIDENTIAL AND PROPRIETARY TO TIGERFLOW SYSTEMS, INC. ("TIGERFLOW"). THIS DOCUMENT IS FURNISHED WITH THE UNDERSTANDING THAT THE DOCUMENT AND THE INFORMATION IT CONTAINS WILL NOT BE COPIED OR DISCLOSED TO OTHERS EXCEPT WITH THE WRITTEN CONSENT OF TIGERFLOW, WILL NOT BE USED EXCEPT FOR THE BENEFIT OF TIGERFLOW AND WILL BE RETURNED AND ALL FURTHER USE DISCONTINUED UPON REQUEST FROM TIGERFLOW.SUBMITTAL DRAWINGTHIRD ANGLE PROJECTION SCALEOUTLINEHVAC-12NAMEPROJECT NAMEDRAWING #PRODUCTION #REV--NOTES: 1. FINISH: GREY, ENAMEL PAINT2. CONDITION POINT: ________GPM @ _______' TDH 3. PIPE SUPPORTS NOT SHOWN FOR CLARITY.4. SYSTEM SHOWN REPRESENTS TYPICAL GEOMETRY ONLY; DRAWINGS SPECIFIC ANT GIVEN PROJECT WILL BE SUPPLIED AT TIME OF RELEASE FOR MANUFACTURE.1 1 PUMP2 1 TANK, EXPANSION3 1 TANK, HIGH DENSITY, POLYETHYLENE, 50 GALLON4 1 CONTROL PANEL5 1 ASSEMBLY, SKID6 2 VALVE, BALL7 1 VALVE, CHECK8 1 VALVE, RELIEFSYM QTY PARTParts List input1_1: input2_1: input3_1: input4_1: input5_1: input6_1: input8_1: input7_1: input1_2: input2_2: input3_2: input4_2: input5_2: input6_2: input7_2: input8_2: input1_3: input2_3: input3_3: input4_3: input5_3: input6_3: input7_3: input8_3: input7_4: input8_4: input1_4: input2_4: input3_4: input4_4: input5_4: input6_4: input7_5: input8_5: input6_5: input5_5: input1_5: input2_5: input3_5: input4_5: input1_6: input2_6: input3_6: input4_6: input5_6: input6_6: input8_6: input7_6: input5_7: input6_7: input7_7: input8_7: input5_8: input6_8: input1_9: input2_9: input3_9: input4_9: input5_9: input6_9: input7_9: input8_9: input7_10: input8_10: input6_10: input5_10: input1_10: input2_10: input3_10: input4_10: input1_11: input2_11: input3_11: input4_11: input7_11: input8_11: input5_11: input6_11: input5_12: input6_12: input8_12: input7_12:
Most popular related searches
