Tigerflow Systems, LLC

Water Heating Systems Brochure

PACKAGED WATER HEATING SYSTEMSPREFABRICATED& FACTORYTESTED3rd PARTYCERTIFIED - UL/C-UL LISTEDSYSTEMSASME SECTION 9WELDINGSINGLE SOURCERESPONSIBILITYASME CODEVESSELSOPTIMALINSULATION &JACKETINGEFFICIENTINSTALLATIONSTANDARDIZED& CUSTOMDESIGNSL I S T E D8 P 5 5Series #Production #Volts/Ø/HzHP(800)-783-6756®Packaged Water Heating Systems You CanCount On....Standard FeaturesASHRAE 90A-1980 Fully Jacketed &Insulated TanksHigh Efficiency Copper-Fin Water HeatersFast response to load demandsGlass Lined Storage Tanks with5 year warrantyBronze Circulating PumpsCopper Interconnecting Piping, HeadersASME Temperature & Pressure Relief ValveIsolation Valves - Full Port Ball ValvesScale Free Performance3rd Party UL/C-UL Labeled - Total SystemASME Section 9 Certified WeldingFactory Pressure TestedStart up and Field TestingSingle Source ResponsibilityEfficient InstallationOptionsCustom DesignsTank LiningsPressure RatingsOutdoor InstallationsCustom Piping ConfigurationsREPRESENTED BY:TIGERFLOW, Your expertsource for engineeredsystems...Factory built & tested TIGERFLOW WaterHeating Systems are available to precisely fitindividual load requirements. Corrosion proof,glass-lined tanks are equipped with life-extending magnesium anode rods. Steeljackets and fiber glass insulation to meetenergy efficiency standards of ASHRAE 90A-1980.An all copper finned heat exchanger provideshighly efficient heat transfer surface whileassuring scale free performance year afteryear. The complete TIGERFLOW system isfactory built, tested and UL/C-UL third-partycertified. That means the unit arrives on sitemeeting and/or exceeding all relevant industrystandards, in addition to site performancespecifications. Liability and performance risksare eliminated. System designers appreciate thetime savings and TIGERFLOW expertise builtinto each project. Coordinated deliveries of thirdparty certified systems make contractorperformance penalties and delays inherent insite-built/site-certified systems a thing of the past.Our promise to you...Your TIGERFLOW factory engineered systemwill arrive ready to go and operate reliably to therequired specifications, with the simplest of siteinstallation.© 1997 TIGERFLOWBulletin WHS 9000 5m97Printed In USASpecifications and dimensions are subject to change without notice.5450 Redbird Center Dr.Dallas, TX 75237(800) 783-6756Tel: (214) 337-8780Fax: (214) 333-2742E-mail: TIGERFLOW@AOL.COMCost-effective engineered packaged water heatingsystems pre-piped for commercial, institutional,process and industrial applications.®SPECIFICATION NO. 9100.2May 2006PAGE 14034 Mint Way, Dallas, TX 75237 • (800) 783-6756 • Tel: (214) 337-8780 • Fax: (214) 333-2742E-Mail: sales@tigerflow.comDATE:PROJECT:ENGINEER:REP:SPECIFICATION FORPACKAGED HEATING SYSTEMFurnish and install a TIGERFLOW Series WHS-9000, U.L./C-U.L. engineered and packagedwater heating system. The system shall be rated for a recovery rate of ____GPM at a ____temperature rise.VALVESIsolation Valves: Provide individual pump suction and discharge, full port ball isolation valve(s)Check Valve: Provide a swing type check valve in discharge headerSCALE THERMOMETERProvide a 9” scale type thermometer. Thermometer shall be adjustable angle type completewith separable well.INSTANTANEOUS HEATERProvide an instantaneous heater of size and capacity listed above. Unit shall be constructedutilizing copper finned tubes with easily removable heat exchanger section. Heating sectionshall be of natural draft construction with burners constructed of stainless steel.The instantaneous heater controls must conform to ANSI Standard 221.13 as well as theCanadian Gas Association Standard. At a minimum, the controls must include: ignitionsafeguard, operating temperature control, high water temperature limit, redundant gas valve,water flow sensing switch, gas pressure regulator, and manual gas shut-off valve.SPECIFICATION NO. 9100.2May 2006PAGE 24034 Mint Way, Dallas, TX 75237 • (800) 783-6756 • Tel: (214) 337-8780 • Fax: (214) 333-2742E-Mail: sales@tigerflow.comHeater firing mode shall be two-stage for boilers 250,000 BTUH and under or (modulating)(four-stage) for boilers over 250,000 BTUH instantaneous heating unit shall be complete withfactory installed bronze circulating pump to provide circulation between heating section andstorage section. Return recirculation pump will be supplied by others. Instantaneous heatershall be a Model #_____.STORAGE TANKSProvide a Model _____, _____ Gallon ____” Diameter x ____” High, glass-lined storage tank.The glass lining shall be fired on the inside of the tank. Storage tank shall have a minimumworking pressure of 150 PSIG. Tank shall be furnished with two inches of insulation meetingASHRAE 90 Lb. 1992 and encased in a baked enamel steel jacket.FACTORY PREFABRICATIONProvide each system as a complete package system on a structural steel mounting frame, pipedand mounted. Unit shall be factory primed and painted with machine grade finish coat. Allwelding shall be performed by ASME Section 9 certified welders.Suction and discharge headers shall be ___” Type “L” copper.NOTE: System manufacturer shall isolate all ferrous from all non-ferrous materials.THIRD PARTY TESTING, OSHA REQUIREMENTThe package shall be UL Listed as a system for its intended use, so meeting OSHA FederalRegulations 29 CFR 1910.303 and 399 as well as NFPA Pamphlet #70 (National Electric Code)Article 90-7, City of Los Angeles Approval Code, CMR248 Massachusetts State Plumbing CodeApproval.STARTUP (Optional)The factory authorized local representative shall provide (2) hours of startup and field training.WARRANTYEach TIGERFLOW system shall be warranted for a period of (18) months from date of shipmentor (12) months from date of startup, whichever occurs first.®Notes:1. Dimensions are not for constructions purposes unless certified.2. All dimensions are ± 1/2”.3. All dimensions are subject to change without notice.4. Pipe supports not shown for clarity.5. All welding done by ASME code section 9 certified welders.TIGERFLOW Packaged Systems are third party U.L. labeled/C.U.L. labeled as a system tocomply with OSHA federal regulations 29CFR1910.303, .399 and NEC #70 Article 90-7MODEL #:SYSTEM TYPE:PROJECT NAME:DESIGN FLOW:DESIGN PRESSURE:DATE:SCALE:APPROVED:DRAWN BY:REVISION NO: Section 13: Packaged Water Heating Systems -Packaged Water Heating System Specifications -Packaged Water Heating Drawings home:
Most popular related searches