Brownfields Articles

  • Green Networks Integrated Urban Infrastructure - Case Study

    AECOM and Collective Architecture were commissioned to undertake a series of feasibility studies using best practice examples in urban infrastructure, sustainable drainage and inclusive urban planning for six future candidate sites across Local Authority areas in Scotland. ...


    By Innovyze

  • Water is a key concern on Earth Day 2017

    Although the official focus of this year’s Earth Day is environmental and climate literacy, water is still very much a key concern for participants holding events across the United States — and around the world. A need for clean water for future generations was the impetus for the original event, and the need to protect water is no less important today. Earth Day was established in ...


    By Fluence Corporation

  • Building demonstrates benefits of net-zero water reuse

    A unique research project to demonstrate the effectiveness of net-zero water use buildings is underway at the University of Pittsburgh and the Center for Sustainable Landscapes at Phipps Conservatory and Botanical Gardens in Pittsburgh. The decentralized water system at CSL treats all nonpotable water on-site. The university is documenting the benefits and costs of the novel water-reuse system, ...


    By Fluence Corporation

  • Case study - Dual-reagent ISCO “Fast-Tracks” cleanup of Orlando Brownfield

    Description: A Brownfield property impacted with chlorinated solvents was the planned location for the home of the Orlando Magic basketball team. Contaminants: Chlorinated solvent contamination was present in soil and groundwater with PCE concentrations greater than 14,000 ug/L and potential presence of DNAPL. Remedial challenge: The ...

  • Environmental Assessment Brownfield Study

    In late 2011, Global was contracted by the Genesee County Land Bank and City of Flint to prepare an Environmental Assessment (EA) in accordance with guidelines set for by the U.S. Department of Housing and Urban Development (HUD) 24 CFR Part 58 for the Smith Village Project. Global utilized the HUD recommended format during the preparation of the EA including completion of the Statutory Checklist ...

  • The direct and indirect impacts of EU policies on land

    The 2011 Roadmap to a resource efficient Europe states, in its milestone of actions to address land as a resource, that 'By 2020, EU policies take into account their direct and indirect impact on land use in the EU and globally …' (EC, 2011d). This report presents a methodology for the assessment of European Union (EU) policies in terms of their land-related implications in Europe and ...

  • Case study - TPH Oil & Grease applications

    These case studies illustrate the performance generated from customers who have used Sitelab’s UVF-3100 analyzer for testing total petroleum hydrocarbons in the C10 to C50 range. Sitelab’s TPH-Oil calibration kit is designed to correlate well to laboratory “Oil and Grease” test methods. This includes EPA Methods 1664 and 9071B by Gravimetric, EPA Method 418.1 by Infrared ...


    By Sitelab Corporation

  • Remediated sites and brownfields: Success stories in Europe

    This document presents examples of success stories of remediation of contaminated soils in various contexts and different European countries. Thirteen countries comprising 19 European regions present a total of 29 cases which illustrate how soil and brownfields remediation along with sustainable land management have become essential for reversing the trend of soil degradation and ensuring the ...

  • £16 million refurbishment of London Bridge Station

    Main Contractor: Costain  Groundworks: Substructure Protection Systems London Bridge Station Work at London Bridge railway station is part of the Government-sponsored Thameslink Programme. With completion scheduled before the end of 2018, the station will have more ...

  • Seattle, WA - Rapid PCE remediation for Brownfield redevelopment - Case Study

    Brownfield Redevelopment in South Lake Union Area of Seattle Project Summary TRS Group, Inc. (TRS) designed, installed and operated an electrical resistance heating (ERH) source area remediation project at a former commercial laundry and dry cleaning facility in the rapidly growing area of South Lake Union in Seattle, WA, The scope of the remediation was to ...


    By TRS Group, Inc.

  • GPS-enabled gas analyser finds & proves borehole locations case study

    Prove it? They can now! Landfill technicians and environmental consultants can now find and prove borehole locations with a GPS-enhanced portable gas analyser from Geotech. Its on-board GPS guidance system takes staff to the precise location of the 1000 it can store. It adds the GPS-received location, date and time to the gas analysis record. GPS locations can be added at boreholes or pre-loaded ...

  • Brownfield and Contaminated Land Development - Case Studies

    Whether it is an old industrial site in the center of a city, the corner gas station, or a former agricultural site that used pesticides for decades, contaminated property can be found anywhere. These sites can be considered CERCLA, RCRA, state regulated, Brownfield or any other designation. Helping to clean up properties like these, is a win win situation for ...


    By EN Rx

  • RCRA and CERCLA Hazardous Waste Sites - case study

    Expert management oversight and support at polluted sites Nationwide The Summary For more than a quarter-century, we provided a wide range of scientific and regulatory expertise on enforcement, permitting and corrective action at some of the nation's most polluted hazardous waste sites. The Client ...


    By AlterEcho

  • Queensland Urban Utilities Upgrades Flood Damaged Site - Case Study

    Adelaide, Australia: Clarke Energy has been commissioned by Queensland Urban Utilities (QUU) to supply two sewage treatment plants (STPs) with new sewage gascogeneration units in Brisbane. Clarke Energy assisting Queensland ...


    By Clarke Energy

  • Redeveloping Brownfields case study

    Challenge: A property owner sought the services of Antea Group to assist in the Brownfield redevelopment of a 17-acre former railroad depot located in a high-profile urban area. The extent and magnitude of known soil and groundwater impacts combined with the time required to remediate the site was a major obstacle to the successful sale and subsequent development of the ...


    By Antea Group - USA

  • Flow measurement technology comparison: GA5000 Vs Hot Wire Anemometer

    A typical landfill or contaminated land site under investigation will comprise of a suitable number of gas monitoring wells, with a planned series of monitoring visits.  The monitoring will include gas flow measurements, which together with methane and carbon dioxide concentrations will be used to calculate gas screening values (GSV) and hence allow the determination of whether any gas ...

  • Brownfield and site redevelopment case study

    Service performed: Brownfield redevelopment Summary: EFI Global performed removal of several underground storage tanks (USTs), coordinated transport and disposal of approximately 1,000 cubic yards of soil from the tank pit on an abandoned wood manufacturing facility located in a downtown area. The property was originally developed in the 1860’s ...


    By EFI Global, Inc.

  • Management of Excess Soil – A Guide for Best Management Practices

    Soil is an important resource. The protection and conservation of soil in Ontario is a valuable  component of maintaining the environment for present and future generations. The Ministry of  the Environment (MOE) encourages the beneficial reuse of excess soil in a manner promoting sustainability and the protection of the environment. The best practices described within this document are ...

  • Global Competition Can Be Brutal and Unforgiving

    Organizations today often waste up to 15 cents out of every dollar in the project delivery arena, at times considerably more. Many companies today have capital spending plans nominally exceeding $1 billion annually. There is quite a bit at stake! Combined, trillions of dollars are wasted and thrown away. Today, many specialist support groups and organizations (within both private companies ...


    By Camargo Associates, LLC

  • Award-winning bioremediation case study

    Tamdown won ‘Best Use of a Single Remediation Technique’ at the 2008 Brownfield Briefing awards for their treatment of this former gasworks in Surrey. After applying Alga Power 101 during the screening process, Tamdown constructed vented biopiles housed in large poly-tunnels. Air was continually circulated through the piles using a low vacuum extraction system, preventing the need for ...


    By A Alga Companhia Limited

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you