- Home
- Companies
- Fleming Gulf FZE
- Events
- 4th Annual Global Pipeline Integrity ...
4th Annual Global Pipeline Integrity Summit
Safety and integrity of pipelines is imperative for efficient and secure transportation of oil, gas and energy resources. Industries have to stick to regulations and simultaneously maintain cost effective operations. 4th Annual Global Pipeline Integrity Summit will gather members of the pipeline industry over three days to overcome these challenges and adopt best practices. The conference will attribute a comprehensive programme covering the key topics of asset integrity, pipeline commissioning, maintenance and ensuring longevity of subsea assets.
Maximizing Pipeline Life-cycle Through Engineering Optimization Techniques
Investment in new infrastructure to support LNG and unconventional gas developments offshore will be a major factor shaping future demand for new pipelines in the MENA region. A prevailing challenge for existing pipelines however, is ‘Maximizing Pipeline Life-Cycle Through Engineering Optimization Techniques’ the theme of the 2014 edition of Fleming Gulf’s 4th Pipeline Integrity Management. Our past editions have initiated industry discussion in global pipeline incidents, questioning industry-wide pipeline integrity management standards. Issues discussed varied from security threats to third party damage, theft to extreme weather induced mechanical failure. Tailor-made to a pipeline operator’s needs, members of the pipeline industry from around the world will convene over three days to adopt best practices and promote asset integrity.
Key take aways
- Re-strategize isolation of HCA Pipelines
- Outlook for Pipeline Technology
- Fasten Offshore Repairs
- Maximize Life Extension & Optimize Decommissioning
Key features
- 2 Focused Pre-conference Workshops
- 2 Interactive Panel Discussions
- 2 Facilitated Round Table Discussions
- 16 In-depth Life Cycle Optimization Presentations
Advisory Panel
David Vickers
Exova, Technical Manager , NACE- Abu Dhabi Chapter, Former Chairman
Nabeel S. Al Ruwaidhi
Oman Oil Marketing Company, General Manager
P.S. Balasubramanian
Indian Oil Corporation, Former GM Pipelines
U. S. Rao
Reliance Gas Infrastructure Ltd., Vice President Operations
Muhib Mehdi
Oil & Gas Development Company, Facilities Integrity Section Head
Mehdi Pirsiavash
Iran Gas Transmission Company, Pipeline Engineering Senior Expert
Sanja Martinez
University of Zagreb Professor, Faculty of Chemical Engineering and Technology
Paul Rostron
The Petroleum Institute of Abu Dhabi, Professor of Corrosion Chemistry
Mustafa Abdullah
Sui Southern Gas Company , Senior General Manager – Distribution
Day 1
Workshop 1 – Working practices to ensure longevity of subsea assets
- Overview of challenging subsea pipeline projects in the global pipeline market
- Deploying difficult pipeline projects – resources and KPIs
- Successfully pre-commissioning and commissioning pipelines in deep water
- Predictive maintenance of newly laid pipelines – ensuring long-term reliability
Workshop 1 – Life extension through optimized pipeline commissioning
- Cold commissioning & hot commissioning for pipelines in tough terrain- better practices
- Creating a check-list of activities to move from installation to operation
- Flooding, cleaning & gauging efficiently
- Considerations for effective pressure testing
- Best practices for dewatering, drying & inerting
Day 2
- Inaugural Address: Vision of ‘Safety for All’ in the U.A.E. oil & gas industry
- Proactive operational analysis – Pipeline capacity utilization
- Ease hot tapping on the line – Threat-free product movement
- Technology’s conquest of the Sulphur pipeline quandary
- Keynote Session: Pipeline buckling – Time to straighten up
- Facilitated round table discussion: Deriving maximum value at integrity digs
Day 3
- Corrosion Super session: Stabilizing heavy crude oil transmission
- Failure modes for steel tube umbilicals – maintaining integrity
- Lessons learned: Pipeline deposit assessment- reducing fouling
- Panel Discussion: Monitor & maintain pipeline integrity
- Round Table Discussion: How can you replace ESDv valve in-line without shutdown?
