Project Description:
RLC Technologies was contracted by PSC to supply an ATDU system for a hazardous material recycling facility located in Norco, Louisiana. The facility processes refinery waste from the Shell and Valero refineries, as well as outside sources. The RLCT plant has been in continual use and remains in use today, processing these waste streams. Through the use of our ATDU system, PSC is able to ‘de-list’ hazardous waste materials, thereby substantially lowering their disposal costs for processed solids.
RLC Technologies continues to support the equipment by providing technical knowledge as needed, and procuring spare parts for our customer.
Cleanup criteria was 1% (10,000 ppm)
Material:
Refinery Waste
Contaminated Soils &
Sludge
Composition:
Solids Content: ±60%
Oil Content: ±20%
Water Content: ±20%
Start Date: September 2008
Quantity Treated: +40,000 tons