RLC Technologies, Inc.
- Home
- Companies
- RLC Technologies, Inc.
- News
- Project - USA 4 - Waste Management
Project - USA 4 - Waste Management
Sep. 16, 2022
Courtesy ofRLC Technologies, Inc.
Project Description:
As a replacement and upgrade to the existing ATDU system, Waste Management contracted RLC Technologies to build a new 84” diameter x 56’ length ATDU system for their Chemical Waste Management Northwest facility in Arlington, Oregon. The system was designed with custom feed and discharge systems. RLC also designed and built a tank farm with more than 200,000 gallons of storage capacity including a custom water filtration and carbon absorption unit.
Material:
Crude oil contaminated soils and drill cuttings
Composition:
Solids Content: ± 75%
Oil Content: ± 15%
Water Content: ± 10%
Start Date: 2017
Processing Rate: 5 ton/ hour
Most popular related searches
waste management
oil contaminated soil
chemical waste management
drill cuttings
oil contamination
contaminated soil
water filtration
chemical waste
waste management system
chemical management


