- Home
- Companies
- A.Hak Pipelines & Facilities
- Products
- Advanced Pipe Explorer Robotics ...
Advanced Pipe Explorer Robotics Technology
Self-propelled, remotely-controlled, and fully-articulated, Pipe Explorer goes where most cannot. With a minimal footprint, the ability to operate in active pipelines, and by collecting multipoint data in one pass, Pipe Explorer is the standard against which all others should be compared. Our fleet of Pipe Explorer advanced robots are at the heart of the value we bring our customers. Fully-articulated and tetherless, Pipe Explorer provides comprehensive data that is comparable if not superior to more conventional pipeline inspection methods, enabling visual and non-destructive inspection with multipoint data collection of natural gas transmission and distribution pipelines as well as liquid terminals, facilities, and stations regardless of the difficulty of the location or complexity of the pipeline.
- We Inspect Challenging Pipelines to Achieve Certainty and Reduce Risk
- Conventionally “unpiggable”
- No flow, low flow
- No launcher or receiver
- We Keep Gas Pipelines In-Service During Inspection
- Urban and congested areas
- Industrial, “live” environments
- Service cannot be interrupted
- We Provide Comprehensive Integrity Data for Decision Making
- Multipoint data collection
- Simultaneous collection
- High-accuracy collection
- We Make Minimal Environmental Impact
- Entrance/egress flexibility
- Minimal excavation requirements
- No need to dispose of waste water
- We Inspect Challenging Pipelines to Achieve Certainty and Reduce Risk
- Conventionally “unpiggable”
- No launcher or receiver
- We Work Within Tight and Congested Terminals and Facilities
- Congested areas
- Multiple back-to-back bends
- We Provide Comprehensive Integrity Data for Decision Making
- Multipoint data collection
- Simultaneous collection
- High-accuracy collection
- We Make Minimal Environmental Impact
- Entrance/egress flexibility
- Minimal excavation requirements
Ten Years of Comprehensive Experience
Shortest inspection: 60′
Highest vertical drop: 30′
Lowest pipeline pressure: 0 PSI
800+ successful inspections
Longest project: 8.5 miles
Longest river crossing: 1,200′
Highest pipeline pressure: 750 PSI
