Zhengzhou Sincola Machinery Co., Ltd.

SincolaModel SKC80 -Concrete Spraying System

SHARE

SKS80 Concrete Spraying System railway tunnel, road tunnel, subway, mining roadway, side slope, water conservancy and hydropower tunnel. Suitable for small working section tunnel and tunnel by layer.

Most popular related searches
  1. Hydraulic unfold working boom system includes six free working position, rotary of big arm, up and down of big arm, three unfolding small arm, rotary for spraying nozzle, swaying of nozzle, spraying nozzle brushing. That makes shotcrete machine more suitable for multi-layer excavation in tunnel condition.
  2. Crawler chassis, equipped with two unfolding hydraulic outrigger leg to maintain the level of machine when it climbs slope.
  3. Mechanic arm dimension(traveling condition) L*W*H 3.2*1.6*2.5 m, 3 meters for minimum working radius in tunnel.
  4. Wireless remote control for unfolding arms working.
  5. Diesel drive system provides force to machine’s traveling or arm’s activity. Electrohydraulic power group provides power for spraying work.
  6. Spraying range(Includes one meter spraying distance), approximately 8.5 meters for max height, 14 meters for max width working site.