Koller Maschinen- und Anlagenbau GmbH

KollerCore Sampling Laydown Frame

SHARE

A perfect tool to ensure safe core samples extraction from the core string on surface. The frame allows to lay down the core samples horizontally without damage, for example directly from the rig floor onto the catwalk. The frame can also be coupled directly to the Core Saw for the core samples to be cut into transportable pieces with protective tube using the saw.

Most popular related searches

The “Lay Down Frame” transport equipment moves the inner pipe with the drill core from the vertical position to the horizontal position. The inner pipe is supported by the transport equipment during the change of position so that as little bending stress as possible is transferred to the drill core.