PRIMA POMPE - by FINVALORI
  1. Companies
  2. PRIMA POMPE - by FINVALORI
  3. Products
  4. PRIMA - Electro Submersible Pumps

PRIMAElectro Submersible Pumps

SHARE

Rotation: clockwise looking at the pump, motor side. Install the pump into artesian wells DN 76mm for 3" types, DN 100mm for 4" and DN 150/210mm for 6" be sure that the electropump is completely filled (clean waters, max temperature 45°C).

Most popular related searches

If there is sand (max 40 g/m3) beed the well before installing the electrosubmersible pump.

Do not run the pump with closed discharge head for more than 2 minutes.

Before starting the electro submersible pump for the first time check that air is nomore coming out from discharge pipe, gradually open the flood gate then start.

Install control panels for electrosubmersible pump with level sound to prevent dry starts.

With high lift plant of electro submersible pump or with pression accumulations install anti water-hammer valves. If the unit doesn`t work for a long period, frequently start the electro submersible pump.