IMA Engineering Ltd Oy
  1. Companies
  2. IMA Engineering Ltd Oy
  3. Products
  4. IMA Engineering - Real-Time XRF ...

IMA EngineeringReal-Time XRF Conveyor Analyzer

SHARE
The Fast Conveyor Analyzer (FCA) by IMA Engineering employs advanced XRF technology for accurate elemental composition analysis of bulk materials on conveyor belts, tailored for challenging mining environments. Since its inception in 1994, IMA Engineering’s FCA units have been deployed globally across various mining operations including base metals, iron, gold, silver, and other precious metals. The FCA facilitates real-time, minute-to-minute analysis for each dumper load, ensuring consistent ore grade supply to mills. It supports connectivity to factory databases or cloud services for seamless data integration. This analyzer aids in optimizing the mining process by providing swift and precise ore grade evaluations, thus minimizing unnecessary crushing operations and reducing financial losses. Typically, users experience a payback period of up to two months.
Most popular related searches

We are proud to introduce our revolutionary online analysis product.
The Fast Conveyor Analyzer (FCA) is based on IMA Engineering’s extensive experience in XRF applications. 

This innovative cross-belt analyzer uses XRF technology to measure the elemental composition of bulk materials on a conveyor belt in tough mining environments.

Always using the latest cutting-edge technologies, the FCA provides accurate and rapid results for sorting and quality control purposes.

Since 1994 we have installed our analyzers all around the world for base metal mines, iron mines, gold, silver and precious metal mines and quarries.

  • Helps mines keep the ore grade to the mill consistent
  • Analyzes each dumper load in real-time
  • Includes connectivity to the factory database or sends the data files into the Cloud

 

  • Get a fast and accurate analysis of the ore grade by dumper load, on a minute-to-minute basis

  • Minimize losses by deciding to stop loading the crusher when it goes too often below the cut-off

  • Faster payback time, up to two months, when using the IMA FCA