ART OBIC - Maintain Stormwater Culverts with Minimal Traffic Disruptions
ART offers an innovative solution for stormwater culvert rehabilitation using the OBIC 1200C, a spray-applied lining system designed to restore and extend the lifespan of severely damaged culverts. This environmentally friendly method ensures the structural integrity of the infrastructure, potentially prolonging its service life by 50 years or more. It is designed to minimize traffic disruptions while maintaining the culvert. By addressing issues early, this system helps avoid the costly and complicated process of a full culvert replacement. The OBIC 1200C provides a strategic approach to culvert maintenance, offering significant advantages for long-term infrastructure management and sustainability. The service targets the efficient management of stormwater while ensuring minimal environmental impact.
By rehabilitating rather than investing in culvert replacement, engineers can save money and keep stormwater drainage systems operating at peak efficiency for decades with no maintenance required. A fast, easy and cost-effective solution, OBIC 1200C is designed specifically for the rehabilitation of stormwater, wastewater, steel and concrete pipe repairs. This spray-applied lining system requires minimal disruption to the flow of traffic, is flexible enough to withstand extreme temperatures and strong enough to be used on high traffic structures.
Additional benefits of OBIC 1200C for culvert rehabilitation include:
- No-dig repair for steel culvert inverts that have eroded or corroded
- Rehabilitation requires minimal downtime and traffic disruptions
- Options for semi-structural and fully structural linings
- Excellent impact resistance and abrasion protection
- Chemical resistant
- Moisture tolerant
- Highly flexible, yet tough
- Complies with ASTM F-1216 and ASTM A849
- 50-year design life
