Ortis Enterprise - Robotic Milling System
ORTIS is a robotic milling system able to produce any type of model necessary to create custom orthoses and prosthesis, leg-foot braces, scoliosis treatment corsets, foam aesthetic covers, orthopedic seats, prosthesis sockets, cranial correction helmets.
ORTIS™ Enterprise is the configuration that allows to reach the maximum productivity (average daily production of 20 models and more) without limitations or compromises on the working area (1200x1200x1800 mm).
ORTIS™ Enterprise is installed on an industrial floor with walls and partitions that delimit its access area; the features of this configuration will allow you to work in the most automated and efficient way.
The installation includes the robot (maximum reach over 2 meters), the turntable, the toolbox (up to 10 tool positions) and the presetting laser; the distinctive feature of this system is a powerfull electro spindle with the automatic tool change.
- System Programming : A license of our ARPP® software ships with the system. ARPP® is powered by 5-axis a tool path generator (ARPPCAM), and allows for a precise ahead-of-time 3D simulation of the milling and material removal process.
- Open System : ORTIS can be used with any 3D scanner or software that makes use of industry-standard formats (STL, AOP, VRML, …).
- Robot type: ABB, 6 axes, 40-60 kg payload on the wrist, working area from 2000 to 2500 mm
- Turntable: In-house designed, it is the 7th interpolated axis. 700×700 mm aluminum working plate, 60 rpm (Possibility to have an additional turntable or fixed table to increase productivity).
- Laser calibration: The standard setup includes a laser guide to perform automatic tool length calibration.
- Working volume: Blocks up to 1200x1200x1800 mm. Possibility to expand the the supporting plate for bigger blocks.
- Compressed air : Minimum 6 bar
- System minimum area: 4000x4000x3000 mm
- Contol unit area: 1000x1000x2000 mm.
- Weight: Robot + base : 650 kg, Turntable: 270 kg
- Control unit: 250 kg, Toolbox: 280 kg
- Power supply: 380VAC three phase, 50-60Hz, 15 KVA (5,5 kw kw average consumption)
