- Home
- Companies
- Kordes KLD water and wastewater systems ...
- Products
- AQUA-SIMPLEXair - Small Wastewater ...
AQUA-SIMPLEXair - Small Wastewater Treatment Plant
The cycles in which the individual phases run are 8 hours, so that 3 cycles take place per day. The excess sludge produced in the SBR reactor is pumped into the pre-sedimentation tank by means of an air lift pump, in regular intervals or as required, and is disposed together with the pre-sedimentation sludge. The SBR reactor is fed and emptied by an air lift pump.
The cycles in which the individual phases run are 8 hours, so that 3 cycles take place per day.
The excess sludge produced in the SBR reactor is pumped to the pretreatment chamber and discharged at regular intervals or as required. Due to the lifting effect, the sludge pump simultaneously serves as a feeding pump for the SBR reactor.
filling - Inflow
The wastewater is conveyed from the pre-treatment into the SBR reactor.
Aeration
The wastewater is enriched with oxygen from the air by means of a diffuser and circulated. The microorganisms that form as a result, are used to treat the wastewater as activated sludge.
Sedimentation
In the sedimentation (settling) phase, the aeration is switched off. The sludge in the plant settles to the bottom. A clear water zone is created in the upper area. This is where the treated wastewater is now located.
Clear wastewater discharge - outlet
The treated wastewater is now pumped out of the clear water zone. The new cycle can begin.
- The small wastewater treatment plant for retrofitting and new construction
- Plug-in compressor with power and compressed air connection
- A compressor brings the necessary oxygen into the SBR reactor
- Including sampling module on the outlet pipe
