FD Petrol Drilling Waste Management
- Home
- Companies
- FD Petrol Drilling Waste Management
- Products
- FD Petrol - Model SU-3000 - ...
FD Petrol - Model SU-3000 -Solidification Unit
Through adding cementing material or sawdust and other solidification chemicals to solidify and stabilize the treated waste. Solidification work integrate pre-mixing, double screw conveyor agitate, truck loading wok ,it is a continuous working unit and can achieve better mixing performance.
Most popular related searches
mixing screw conveyor
drilling waste management
screw conveyor
mixing system
drilling waste
waste solidification
waste management
mixing conveyor
waste stabilization
nanofiltration membrane
The solidification process operates continuously, requires pre-set solidification chemistry to be added to the waste when it is pumped or loaded into the solidification unit, a vacuum chemical feed system introduces the solidification agent into the waste at required dosage rate, the materials are mixed at pre-set mixing time then discharged into a skip for offsite disposal.
- Model: SU-3000
- Storage Tank: 10 m`diameter: 2.5m
- Vacuum Feeding System: 3200 kg/h
- Dedust: Filtration area 5 nf
- Air Consumption: 1501/min pressure 0.6-0.8 mpa
- Weighting System: Automatic
- Mixing System: Double screw conveyor
- Mixing Capacity: 3000kgrtiour
- Space Coverage: 3300mm, 2500mm, 6600inm
