Tiroler Rohre GmbH
TRM - Bridge Construction Piling System
Simple and fast pile installation leads to short overall construction times. Large bending moments are carried through the pile into piles and horizontal forces are taken care of using raked piles.
- Even load transfer in the area of the abutment
- Reduction in the size of individual foundations under the bridge piers
- Preparation of foundation based on construction schedule
- Flexible adjustment of pile lengths to the building ground on site and to changing building-ground conditions
- Fast and restrained Plug & Drive joints®
