- Home
- Companies
- Welltec A/S
- Products
- Welltec - WAB for Well Abandonment
Welltec - WAB for Well Abandonment
This realisation has driven is a paradigm shift in drilling and well well construction methodology, to implement best practice for later well abandonment over the duration of the well life, during design, construction, production and ultimately abandonment. Cement alone is not a reliable barrier, and operators and now planning for the installation of multiple barriers and multi component barriers e.g. combine cement with mechanical barriers and resins to construct wells now, planning for the future.
To support this market shift, our WAB range, when incorporated within the cased hole for IS0 14310 V0 barrier or open hole, for IS0 14310 V3 isolation across the cap rock during well construction phase, will provide added future value as the foundation for placement of P& A cement plug, significantly reducing the future complexity and cost associated with P&A.
IS0 14310 V0* cased hole SCP barrier
IS0 14310 V3* open hole SCP cement assurance
IS0 14310 V3* standalone open hole SCP isolation
Platform for 2nd stage cement
Open hole cross flow isolation
Open hole fault isolation plug
Liner or casing hanger
Future platform for cap rock P&A
Whip-stock placement for sidetrack
WAB can be incorporated within open hole, cased hole and hostile environments
*Leak rate criteria
Rugged, all welded, metallic construction
Rotatable during deployment & primary cementing
Casing Integrity post setting via Intergi-lock system
Flow back assurance for extreme environments via integri-lock system
Full bore ID – as per casing / tubing
Extensive portfolio to cover all open hole & cased hole requirements
