AB-GM
Assessing the Need for Remedial Measures and the Level of Urgency
FromAB-GM
Based on the results of the on-site inspection/examination/building examination and, in some cases, based also on the metrological and analytical results, the need for remedial measures and the level of urgency of such measures that may be necessary at your workplace or in your rooms and buildings needs to be clarified and assessed in line with the relevant directives and recommendations
Most popular related searches
polycyclic aromatic hydrocarbon
PCB regulations
asbestos regulations
polychlorinated biphenyl
asbestos
metrology
clarifier system
PCB
- Asbestos: pursuant to the Asbestos Directive of North Rhine-Westphalia
- Polychlorinated biphenyls: pursuant to the PCB Directive of North Rhine-Westphalia
- Pentachlorphenol: pursuant to the PCP Directive
- Polycyclic aromatic hydrocarbons: pursuant to the relevant PAH instructions
- Mold fungus: pursuant to the Mold Fungus Rehabilitation Guideline
If remediation and/or clean-up measures are required, possible preliminary action, the time and scope of the rehabilitation and/or remedial measures, etc. will be discussed with you and the certified specialized company involved.
