Ridge Environmental Solutions

Complex Soil Remediation Project

SHARE
Ridge staff managed a complex soil remediation project for a petroleum release at the Miami International Airport during the multimillion dollar construction of Concourse A. The site activities occurred simultaneously with significant overhead construction and immediately adjacent to subsurface communication utilities that were vital to the operation of the airport. The work was performed simultaneously and in cooperation with contractors performing the concourse construction and the jet fuel line installation. Free product was present on the shallow groundwater surface. A total of 13,000 tons of contaminated soil were removed during the project.